The house arrives & I get a real life Tonka toy!
Well, things, as I suspected might be the case, have gone from slow, slow, slower, to a sudden rate of knots overnight. After an initial bump where we discovered that the architect had drawn the SIPs to start at the beam and block floor level, (but with 2 weeks to go the SIPs designer pointed out that the soleplate must be 150mm minimum above that), we quickly got the builder to some blocks laid to give us the 100mm insulation, 75mm screed + stone floor height needed.
Building regs guy arrived and unfortunately our first one who I had found seemed very practical has left the firm and this one seems very, very keen. I was a little disconcerted to hear him asking me if Kingspan SIPs have certification - I'd really have expected him to have heard of Kingspan! He quizzed the builders doing the blocks as to their experience and queried if the pipes have gravel around them (already inspected and passed by his predecessor prior to filling in), and also wants to see the engineers reports (already submitted to his firm at the very beginning of the process). He seems a nice guy though and hopefully once he is assured everyone knows what they are doing he will be less concerned, though the firm is doing both our BR work and our building warranty, and there seems to be confusion over whether they want to do separate inspections or will let one inspector do it (which would seem logical to me, but hey ho)...
On Saturday the scaffolders came, preceeded by a delivery of brand new scaffolding which must have cost a fortune, so we have a very very shiny set of scaffold. They finished off on the Sunday, and on Monday the SIPs folks arrived.
07:30 and I was on site ready before them when the telehandler (which turned out to be brand new!) I had to hire for them turned up - the driver couldn't get the wagon up our road (he'd certainly had some fun negotiating his way here and almost got jammed between 2 farm buildings, having to reverse out and try another way) so he took the machine off ...and handed me the key of this brand new 14mettre reach telehandler ..... so I tried very hard not to grin like a small boy as I fired it up and drove it up to our place . Anyone else remember Tonka toys?
Next was the first of 2 artics with our house in them - fortunately the SIPs guys arrived and the one with his telehandler ticket unloaded the wagon. The three of them are camped in a (nice) caravan and the estimate is 2 weeks, which is longer than I expected, but it really doesn't matter either way. It is interesting to see the care they take in getting the panels firmly attached. Low expansion foam into the joint, then a device which pulls the two panels together very firmly indeed before about 50+ annular nails each side are fired in. These things aren't coming apart in a hurry!
- 3
10 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now