flanagaj Posted 23 hours ago Posted 23 hours ago Not sure if it's acceptable to do this, but our new builders have laid the blocks onto the Radon DPC with no mortar below the DPC and only mortar above the DPC. I did question this and they said it's fine. I even raised it with BCO and he said it was ok. Doesn't sound right to me, but I wonder if anyone has any experience of this approach. This xxxxxxx Radon membrane is the bane of my life and our neighbours said there isn't Radon here (BGS maps show 3%) The thought of having to demolish another bricklayers work is going to send me over the edge.
MikeGrahamT21 Posted 23 hours ago Posted 23 hours ago Whether right or wrong, I’ve had 4 extensions done on my bungalow and none of them have mortar below the DPC, only above, and haven’t had any problems in the last near on 20 years. I have read people mortaring under the DPC but not sure what it brings really, plastic is never going to adhere to mortar, not strongly anyway, and the weight of what’s above will keep it where it should be
flanagaj Posted 22 hours ago Author Posted 22 hours ago 29 minutes ago, MikeGrahamT21 said: Whether right or wrong, I’ve had 4 extensions done on my bungalow and none of them have mortar below the DPC, only above, and haven’t had any problems in the last near on 20 years. I have read people mortaring under the DPC but not sure what it brings really, plastic is never going to adhere to mortar, not strongly anyway, and the weight of what’s above will keep it where it should be I can see why they don't put mortar underneath. You have a continuous sheet of DPC which is 500mm wide on the horizontal and then it rises 225mm on the vertical before spanning the outer leaf. Plus it's all taped to the corners, so how you would physically lift it up to put mortar underneath it is beyond me.
Mr Punter Posted 21 hours ago Posted 21 hours ago Please shut up about radon. It is low where you are. More chance of being run over by a milk float. 1
flanagaj Posted 9 hours ago Author Posted 9 hours ago 11 hours ago, Mr Punter said: Please shut up about radon. It is low where you are. More chance of being run over by a milk float. It's a shame, I cannot say that to building control. 1 1
Oz07 Posted 8 hours ago Posted 8 hours ago Yeh don't worry I've never seen it done either. Its one of those textbook things which should be done but never is in practice. 1
Mike Posted 6 hours ago Posted 6 hours ago (edited) Yes, DPCs should be laid on a mortar bed and, if the DPC has a BBA certificate, you'll find it mentioned there*. However brickies (and, it seems, BCOs) aren't always taught that, or just take the shortcut. It's always been done on sites I've run, but omitting isn't going to cause a problem most of the time. *If not, it may get a mention in the manufacturer's info. 16 hours ago, MikeGrahamT21 said: I have read people mortaring under the DPC but not sure what it brings really It provides a smooth surface that protects the DPC from any sharp brick edges or projections that could damage it. Edited 6 hours ago by Mike 1
Oz07 Posted 48 minutes ago Posted 48 minutes ago Got me thinking how does a flashing interact with a dpc tray? By grinding a lead flashing into a course are you not sending water behind it if running off a doc tray?
Mike Posted 27 minutes ago Posted 27 minutes ago 18 minutes ago, Oz07 said: Got me thinking how does a flashing interact with a dpc tray? The tray goes on top of the flashing, discharging any water onto it.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now