john0wingnut Posted 1 hour ago Posted 1 hour ago Afternoon all I have just had an inspection visit for my timber frame rear extension. It is a single storey 6x2 timber frame, 400 centres, 11mm OSB on the outside, breather membrane and is to be finished with vertical thermo pine, on batten / counter batten. The BCO has advised I need to put intumescent cavity closers in at the top / bottom and around the windows and doors, which is not something I thought was required for ventilated cladding; I've just got mesh top and bottom. Windows / doors have a cladding cheek to finish, so are closed already. Can anyone on here enlighten me? John
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now