No residual cavity space left!


Sunil237

Recommended Posts

Another problem!

My builder was supposed to build with a 125 cavity and use 115mm ecotherm full file cavity insulation t&g leaving a 10mm gap... 

They have built to dpc and built all the block work but there's no 10mm gap once you place a brick on the dpc

 

The 10mm gap is to prevent transfer of moisture but it's literally going to be touching the boards

 

Is this an issue and can anyone provide an alternative insulation that would work?

I really don't want to compromise the u value as I am going for a heat pump

 

I need them to keep on track and start bricklaying tomorrow! He's only just told me this is going to be the case today

Link to comment
Share on other sites

Your Architect is at fault 

Not the bricklayer 10 mil is not enough 

Even if the brickwork and blockwork is absolutely perfect 10 mil isn’t enough room 25 is tight but 50 is better 

Im surprised no one has pointed this out 

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...