Hi all, 

 

I'm building an oak staircase going up to an external oak balcony.  On the balcony are two newel posts, that connect to the horizontal floor of the balcony via a cross lap joint.  You can see the notch cut in the post in the picture, which engages with a similar notch in the horizontal oak beam of the balcony.  It will thus be the only connection to the balcony.  The long notch below it is to receive the stringer for the staircase.

 

My question is how these should be fastened.  My builder assistant thinks that dowelling and glueing will be sufficient.  I am minded to use stainless steel threaded bar and nuts/washers. What would you people recommend?

 

Cheers.

 

Alan

Newel Post.jpg

Link to comment
Share on other sites

>>> My builder assistant thinks that dowelling and glueing will be sufficient.  I am minded to use stainless steel threaded bar and nuts/washers.

 

Traditionally a dowel or two only, no glue - say, 20mm. Huge oak buildings used to be built with nothing but woodwork joints and dowels. Taper it a bit so it's a tight fit when it's malleted in. From memory, you can do something clever with a slight oval so it pulls up even tighter as the oak dries out and shrinks (although that looks like dried oak already).

 

Or sure, biggish SS bolts, threaded rod, coach screws etc. A4 SS because oak is quite corrosive. Anything of the size that looks right (M10-M16 say) will be crazy over-specified for the shear load.

  • Like 1
Link to comment
Share on other sites

Yes, I have some 20mm dowels.  I was thinking of using 4,  but maybe that's over the top.  There aren't too many forces acting on it.  The main one will be the stringer, pushing the bottom in, but it's not a huge force.  And I guess if it does start to get wobbly I can always add a SS rod at a later date.

Link to comment
Share on other sites

4 hours ago, Alan Ambrose said:

>>> My builder assistant thinks that dowelling and glueing will be sufficient.  I am minded to use stainless steel threaded bar and nuts/washers.

 

Traditionally a dowel or two only, no glue - say, 20mm. Huge oak buildings used to be built with nothing but woodwork joints and dowels. Taper it a bit so it's a tight fit when it's malleted in. From memory, you can do something clever with a slight oval so it pulls up even tighter as the oak dries out and shrinks (although that looks like dried oak already).

 

Or sure, biggish SS bolts, threaded rod, coach screws etc. A4 SS because oak is quite corrosive. Anything of the size that looks right (M10-M16 say) will be crazy over-specified for the shear load.

I like the idea of staying reasonably traditional, but might perhaps use some sort of bolt too, as suggested in a later post, and avoid the glue.  

You say it looks dry, and it does in the pic, but it's very very fresh - the wood was very damp when chiselling out the mortice, and it attacked my tools - I couldn't believe how much rust it caused in a day on my bullnose plane.

Link to comment
Share on other sites

 

17 hours ago, joe90 said:

Can I ask why?

I think it'll be hard to assemble (giving me limited time to actually put the parts of a complex and large assembly together), and make it impossible to disassemble should I want to, without causing major damage to the wood.

  • Like 1
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...