May 17, 20179 yr We are fixing some 18mm ply down onto 22mm chipboard in bathrooms so we can finish with 2.5mm Luxury Vinyl Tile and the finished level will match the oak floor on the adjacent landing. I was thinking of screwing this down, but we can't get many fixings into the underlying joists, so I would like to just screw into the chipboard using 38mm screws. Can I get these threaded half way, so the ply does not get jacked up by the screw? I will be needing a fair few.
May 17, 20179 yr http://www.screwfix.com/c/screws-nails-fixings/woodscrews/cat840066#category=cat840066&productlength=38_mm
May 17, 20179 yr Author Do you know which ones are threaded half way? Screwfix tend to show the same pic for all lengths and mostly the shorter ones are fully threaded.
May 17, 20179 yr what is stopping you from aiming at the joists? you don't often see anything below 45mm with some bare shank, Reiser for example are fully threaded until they get to 60mm IIrc
May 17, 20179 yr 10 minutes ago, Mr Punter said: Do you know which ones are threaded half way? Screwfix tend to show the same pic for all lengths and mostly the shorter ones are fully threaded. On occasion I have gone into Screwfix and asked to look at about 8-10 similar items before buying one sort. You could do that. They have always been amenable. The only one which ever raised eyebrows was when I looked at about 6 different sorts of security safe, and they were still tolerant despite the weight.
May 17, 20179 yr Just drill a clearance hole in the boards then screw it down, jacking won't be a problem. If its floor boards then glue is also a must to prevent squeaking You can set a depth stop on the drill using a short length of suitable diameter pipe round it.
May 17, 20179 yr As @MikeSharp01 says above just pre-drill the top board. You could save even more time by using a countersunk pilot drill. Something like: Linky And glue too!