GrantMcscott Posted February 5, 2022 Posted February 5, 2022 Hi As the title would like my stone slips to go to the ground. This would mean breaching the DPC which is not advisable but is there a safe way to do it. Thanks
JohnMo Posted February 5, 2022 Posted February 5, 2022 We left enough DPC sticking out, so we could have DPC between the slips that are above and below it.
GrantMcscott Posted February 5, 2022 Author Posted February 5, 2022 14 minutes ago, JohnMo said: We left enough DPC sticking out, so we could have DPC between the slips that are above and below it. Yes this would of been a good idea but this has not been done
Dave Jones Posted February 5, 2022 Posted February 5, 2022 yes, build in a vertical DPC/cavity tray. 1
Russell griffiths Posted February 6, 2022 Posted February 6, 2022 I’m doing mine with a liquid dpm as the natural stone is not flat. so 3-4 courses of stone then painted on dpm then carry on up in stone. 1
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now