Guest Posted May 12, 2020 Share Posted May 12, 2020 Hi everyone, I'm in Scotland and considering buying a plot. New to building etc so a bit clueless. What do you think is per m2 for a 100m2 bungalow, built via ICF or cavity block? Excluding kitchens, bathrooms fittings and using mid range windows, not top of the range. Including all fees, connections, under floor heat pump heating etc. Link to comment Share on other sites More sharing options...
nod Posted May 12, 2020 Share Posted May 12, 2020 &830 m2 253m2 two story traditional Finished to a high standard Link to comment Share on other sites More sharing options...
ProDave Posted May 12, 2020 Share Posted May 12, 2020 I think @nod build is exceptional. I am expecting to complete for £1000 per square metre. Many end up with higher figures than that. It all depends how much you are prepared to do yourself. 1 Link to comment Share on other sites More sharing options...
Conor Posted May 12, 2020 Share Posted May 12, 2020 Consensus is that in the north of the UK you can complete a modest house for £1k/m² (if you get your hands dirty) or less. We're in NI and are aiming for £1k for finished areas and £500 for basement as it will be a shell only, so £850/m² overall for 300m² = £255k. And not a penny more lol. Bear in mind there are economies of scale.... A 200m² two story house will cost 50% more than a single story 100m² house (before furnishing etc) rather than double. (I could be totally wrong) Link to comment Share on other sites More sharing options...
Guest Posted May 12, 2020 Share Posted May 12, 2020 Ideally I think I'd go for a main contractor, did you guys? Do you find the best ones through the architect? Can anyone recommend a good contractor in Central Scotland for ICF or Blockcavity? What's the/was your turnaround time from giving the go ahead to completion? I realise some of these questions are how long is a piece of string! Link to comment Share on other sites More sharing options...
ProDave Posted May 12, 2020 Share Posted May 12, 2020 I chose a contractor to build the shell only, based on personal experience (I had worked with them on another build before) Since bare shell I have done everything myself bar the plastering and a small amount of joinery. Just into year 5 and another to go probably. But it's been slow due to drip drip finances. Link to comment Share on other sites More sharing options...
SuperJohnG Posted May 12, 2020 Share Posted May 12, 2020 It is a hotly debated topic on what is and is not included in the magic /m^2 price. Unfortunately you will not find a reasonable resolution to it., some people include plot, services etc. when others don't My advice is to read read read on here and you will find some answers and get a better feeling for it. However to give you an idea, I have excluded plot costs, utilities and all professional fees, architect etc. My budgeted build costs projection is basically to go from bare plot to a fully finished house ready to move in (building only , not including landscaping or acess). I'm south of Glasgow, aiming at 1200/m^2. I will be a mid-high quality standard build. Supply and erect from a kit company and then project manage myself with local subcontractors and do a good portion of some work myself such as all the plumbing, help with first fix electrics (possibly do my own insulted raft). That's my budget plus I have 10% contingency allowed on top. If i don't build for that then something has went wrong. Complexity (house shape) and finish standard and build route play a large part. If you can do lots of work yourself, then cost comes down. The housebuilders bible is a good book to read, (edition 13 out now). One thing to note that everything is linked to the 'triangle' TIME / QUALITY / COST. You can have any two of the three but not all. E.g I can be cheap and high quality, but its going to take a long time. or It can be High quality and done quick its going to be expensive. If you are in Scotland I would say the figure sin the homebuilding and renovating self build cost calculator work well for a starting point (Google it). But you can be anywhere from 1000/m^2 (Lots of your own time and effort) up to 2200/m^2 (main contractor full build). Enjoy learning. 1 Link to comment Share on other sites More sharing options...
SuperJohnG Posted May 12, 2020 Share Posted May 12, 2020 11 minutes ago, newbuild20201 said: Ideally I think I'd go for a main contractor, did you guys? Do you find the best ones through the architect? Can anyone recommend a good contractor in Central Scotland for ICF or Blockcavity? What's the/was your turnaround time from giving the go ahead to completion? I realise some of these questions are how long is a piece of string! Look up Econekt in Glasgow. I have not used them, but have talked to them and they do ICF with the Izodom system. Link to comment Share on other sites More sharing options...
nod Posted May 12, 2020 Share Posted May 12, 2020 6 minutes ago, newbuild20201 said: Ideally I think I'd go for a main contractor, did you guys? Do you find the best ones through the architect? Can anyone recommend a good contractor in Central Scotland for ICF or Blockcavity? What's the/was your turnaround time from giving the go ahead to completion? I realise some of these questions are how long is a piece of string! The materials will be the same price where ever you are lactated Inner London will have a congestion charge Labour will vary Manchester and surrounding areas are not cheap But probably less than the SE Like Dave we did most of the work ourselves So it wouldn’t of really made much difference if we had been located elsewhere Labour is a massive chunk of your budget We pushed the boat out with the German kitchen spending 18k The fitting cost would have been 6k (Specialist )I fitted it myself IN two days It was the easiest kitchen I have ever fitted Link to comment Share on other sites More sharing options...
Guest Posted May 12, 2020 Share Posted May 12, 2020 What are the basic steps? Foundations Walls and Roof Windows Plasterboards Plumbing and Waste Electricity Then fixtures and fittings eg doors, kitchens. Is that accurate? Link to comment Share on other sites More sharing options...
Thedreamer Posted May 12, 2020 Share Posted May 12, 2020 (edited) For us Planning Services - water, electricity Access Site clearance Foundation/Drainage Ground floor Walls Trusses Windows Roof Insulation External skin 1st fix Outside painting Plasterboard Taping/filing Stove Stairs Internal Painting Flooring/skirting, doors Treatment tank/landscaping Kitchen/Bathroom I work on a subcontractor basis and supply materials. Not a tradesmen or that good at DIY. Just done labouring, painting and fairy easy jobs. I have very little interested in m2 cost just to keen to keep my overall monthly mortgage/utility cost to a minimum. As @SuperJohnG mentioned first step for you is to go on Amazon and buy the home builders bible. I keep a blog here that documents the different stages. Edited May 12, 2020 by Thedreamer 1 Link to comment Share on other sites More sharing options...
Guest Posted May 13, 2020 Share Posted May 13, 2020 Thanks, will take alot at the book. Why use a subcontractor, and not just main contractor, main contractor more expensive? What was the average time from the first day workmen start on the site, to your completed home? Link to comment Share on other sites More sharing options...
Thedreamer Posted May 13, 2020 Share Posted May 13, 2020 41 minutes ago, newbuild20201 said: Thanks, will take alot at the book. Why use a subcontractor, and not just main contractor, main contractor more expensive? What was the average time from the first day workmen start on the site, to your completed home? Using subcontractors: Allows me to pick and choose who does the work and when I want them to. It very likely that a main contractor would charge a higher price to cover their overheads and profit margin. I like to choose the spec of materials used in the build It is more work as I have co-ordinate the trades, research materials and also have more delays. But as @SuperJohnG mentioned earlier, the self builders triangle, cost, speed and quality. You can only choose two of the three. Most members here would choose cost and quality. Your second question can't really be answered until you work out what you want. I.e. you can pay more a pre-modular type construction where the house is constructed very quickly but this typically comes at a cost. But as you asked I started our build process 11 years ago when I was 22. But we broken ground in March 2018. Not finished yet, but should be fairly quickly after the lockdown in Scotland is relaxed. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now