Jump to content

Kelvin

Members
  • Posts

    4081
  • Joined

  • Last visited

  • Days Won

    48

Everything posted by Kelvin

  1. Well that’s nice and clear
  2. What’s your specific experience of both?
  3. Yep. I thought it was a typo at first. 😂 In fact the kitchen has cost us much more then we planned. Consequently we’ve compromised a bit on some of the finishing materials which has brought the kitchen cost back to our original budget.
  4. Void is far too big. Noise, kitchen smells will travel to the upstairs and it will echo. Make it smaller and above the hallway (or remove it completely) Fixes your open kitchen and reduces the problem of the stair being in the wrong place. We have very few windows on the North elevation and those we do have aren’t large. We also have far too much glazing on the south elevation though.
  5. I was chatting to the groundswork guy today. I mentioned that we briefly considered a subterranean build for our sloping plot. He’s built a few over the years. The last one he did was deep at three floors but only one above ground. The cheapest warranty quote the guy could get was £37,000 plus site insurance on top which was also dear. He reckoned it will cost £2500/m2 based on his experience.
  6. We’re In Scotland. While there is a copper telephone cable nearby it’s overhead and barely usable for telephone calls let alone anything else. We’ll put in an extra duct to future proof us. For now our internet access is via Starlink with LTE as a backup and wifi calling for phone use. I’ll probably put in a VOIP phone.
  7. It’s saying crack on. If you find contamination then stop all work and points 1 and 2 apply. Beers all round. Congratulations!
  8. Good stuff. Big weight off your shoulders.
  9. If I could have built a subterranean basement house on our slope for that money I’d have been all in. It would have looked stunning although I doubt it would have achieved planning.
  10. One of the nicest kitchens I saw on Grand Designs was the re-purposed science lab wooden desks. When they described it, it sounded like a daft idea but when finished it looked brilliant. Also cost buttons. This was in the house that was a concrete bunker. I was less keen on the house. A lot of little things massively up the cost of kitchens. My other half wanted a shadow gap all the way around the island. I was rather taken aback by the amount this added!
  11. Yes it’s what often happens. Kitchens and bathrooms get ripped out. I walked by a skip in a dear part of Edinburgh (well it’s all dear) and it was full of very expensive tiles and a large broken up stone worktop. I got chatting to the builder and he said they regularly rip out perfectly good kitchens. More often than not they are told to smash everything up too. As my old mum used to say toff’s are careless. We also have some close friends who have put a brand new Aga into every house they buy and they are serial house buyers. Four in the time we’ve known them.
  12. What are you putting inside the tall cabinets? Is it just going to be cupboards and shelves? They are very impractical in my experience of previous kitchens. This time all our tall cabinets are either larder units that pull out or have drawer units in them. In fact we don’t have a single cupboard in the kitchen as we have loads in the utility room. Larder units and drawers up the cost significantly. Large worktops are dear of course. Ours is 3.1m x 1.2m Cliveden quartz.
  13. Petrol leaked from a car and traveled 300m to the extraction point in less than 24 hours?
  14. You also might find that the cost reduction isn’t as much as you think it might be by making it smaller. Post up your plans as there’s a lot of experience on here to help you understand what could be done to reduce the cost without having to re-design and re-submit the planning application.
  15. I used a local farmer who popped up to the field with his tractor and a bowser of water for the percolation holes. He dug the holes where the engineer wanted them and I filled them all in again. £80. The challenge our sloping site presented was how to meet the fall conditions for the driveway. We then spent a while trying to optimise the house position to meet the planning condition and minimise the amount of cutting and filling to level the site.
  16. I’d contact CMLC and get a quote as at least you’ll know what you’re dealing with cost wise.
  17. Yes, and any other contract you signed and every email you exchanged about it. If you find anything send it to him. But if you find CMLC can offer you a retrospective warranty for a price you feel is ok I’d probably go with that for speed. You can then follow the RIAS complaint procedure if you think you are in a strong position.
  18. It’s CMLC. Very good price for us. https://www.cmlcltd.uk What does your contract with the architect say? Did you sign a copy of the RIAS Scottish Conditions of the appointment of an architect form?
  19. @AliG I agree with your point about making compromises with the build. I’d imagine most self-builders have to do it. However this wasn’t really the original point you made which was ‘people expect to find fittings on a house somewhat commensurate with its value…’ That’s fine if you’re building it to sell or show off to your friends. But if you’re building it for you none of that matters. Personally I couldn’t give two stuffs what people think or expect. I’m not a brand person. I fit things based on performance and value rather than the badge on the front of it. If I had my way I’d have all the names removed from the appliances anyway. The OPs house will look and feel stunning whether he fits Miele ovens or some lesser brand.
  20. It says the budget was £1.5 million and it’s 300m2 so given you recognise some of the finishes aren’t ultra expensive it still makes it a very expensive build.
  21. If you’re not building the house to sell which people are you talking about?
  22. Good tip. My Hi-Fi/music room will be carpeted over UFH in Gunn Modern tartan that’s hessian backed so shall keep that in mind. I’m prioritising acoustic performance over heating performance for this room albeit the amps will help heat the room up when in use.
  23. Yes our total roofing cost including rainwater goods, standing seam for the main house (143m2) and single ply membrane for the flat roof and dormer (73m2) will come to just under £30k fitted including all the membranes and prep work. That’s hard quotes I’ve contracted to. To add that this has taken a lot of negotiation and multiple quotes from a number of companies with many more declining to quote at all as too busy. It’s still not a buyers market. If I’d gone with the dearest quotes it was over £40k and I’m building two rectangles with simple roofs. It’s also in rural Scotland so not £6000/m2 land.
  24. None whatsoever and if you’re selling at this level of house folk often replace the kitchen anyway.
  25. To give you some idea of our costs. Flat roof - agreed a price this week. 73m2. Costs ranged from £12k to £5.5k for Alwitra. 6 quotes. We went with £7.7k Our kitchen appliances are £8k including a Quooker and two washing machines. I deleted one of the three ovens. Large Island worktop - £3.3k fitted. etc
×
×
  • Create New...