  1. The MF looks great. I've never seen it in the flesh so it's great to see. I see they have included the deflection heads by using the deeper track which is good. Crazy how much more expensive the deeper track is than the standard track. (about 3x).
  2. Cool, thanks. Looks tidy and good large service openings in the studs. The Tradeline studs look to have pretty small service openings. Are they standard 92mm C-studs? Hammer in similar to these: https://www.builderdepot.co.uk/spit-udz-6mm-x-35mm-fire-resistant-hammer-in-fixing-pack-of-100
  3. @Conor to understand your install a bit more I was hoping you don't mind me asking the following Do you know what fixing they have used to attach the GL2 brackets to the underside of HCF? If not, a close up photo would be cool. Did they put up the MF for partitions first? They haven't used GL8 perimeter along the ICF which I guess is to do with the ICF. Do you know their plan at the edges? What plasterboard are you going to use under this? Thanks
  4. Architect has included enough details. He's specified 150mm void with Casoline MF. I don't want or need such a large void.
  5. I'm tempted to go for MF I-studs rather than C-studs but they are about 3x the price without supported pricing. In terms of feeling solid, Does anyone know how 70mm I-stud compare to 92mm C-stud? Having a 6y.o. who already likes slamming doors doesn't bode well for the years to come if I don't have solid feeling partitions.
  6. This one includes Resilient Channel
  7. Sorry you did say that. Found an installation video. The brackets look to be GL2 and the channel is GL1 (sections can be joined by GL3) and a perimeter of GL8 (also used for pattresses). GL1 brackets seem to normally go in at 600mm x 1200mm centres. GL3 joins sections of GL1 as required. In parts (Speed Pro not BG): GL1: 1.67m/m2, £1.14/m, £1.90/m2 https://www.builderdepot.co.uk/metal-lining-channel-3600mm-gl1 GL2: 1.4/m2, 12p each, 16p/m2 https://www.builderdepot.co.uk/195mm-gypframe-gypliner-brackets-gl2-box-of-100 GL3: 0.3/m, 0.5/m2, 12p each, 6p/m2 https://www.builderdepot.co.uk/gypframe-gypliner-channel-connectors-gl3-box-of-50 GL8: £0.83/m https://www.builderdepot.co.uk/metal-track-3000mm-gl8 An arbitrary 4m*4m room would cost 16m2*(£1.90/m2 + £0.16/m2 + £0.06/m2) + 16m*(£0.83/m) = £47.2 or about £3/m2 plus screws. BG may be more expensive as likely a better brand (?). 47x50 timber at 600mm c/c would be £2.75/m2 so GypLyner does compare well with the timber cost. Perhaps not so favourably historically, but based on where timber prices are now... Whilst the timber feels easier to install to a flat level surface, under the hollow core camber the ease of adjusting the metal frame looks very attractive.
  8. Sounds neat, easier than chasing blockwork!
  9. Looks great, what system is that? Do you have a link to the brackets?
  10. Architect included a 150mm MF void, but seems pointless (no ducting). MF needs at least 100mm I think. To get it flat I was planning to pack each mounting as @Mr Punter suggests. To mount the timber to the underside of the HCF I was planning on something like these masonry screws at 400mm c/c.
  11. Basic architect 'construction drawings'
  12. Opinions seem a bit divided over 12.5mm plasterboard on 600mm c/c: https://www.plasterersforum.com/threads/600mm-centres.61316/ Seems a bit perverse to go for 15mm plasterboard @600mm c/c to save timber cost, but may end up the better choice. 600mm saves 33% over 400mm 480mm saves 17% over 400mm but is not a standard spacing so a bit weird
  13. 600mm centres would be great. I thought 12.5mm needed 400mm c/c, perhaps that's 9.5mm plasterboard then.
  14. Just finished phoning around for prices and the timber for the void would cost: 50mm void (47x50) £4.13/m2 (£1.65/m) 38mm void (38x50) £3.23/m2 (£1.29/m) 25mm void (25x38) £2.01/m2 (£0.81/m) In more normal times all of those prices would probably be halved. Painful to pay more than 4x2 prices for 2x2.
  15. I had considered not having a ceiling void under our hollowcore (see below) but think I do need it really, but plan to keep it to a relative minimum. That raises the question of what the minimum is. Is there a reg that needs to be followed? There are lots of downlighters that support shallow voids (e.g. https://www.downlightsdirect.co.uk/shallow-downlights.html?depth_range=1-50), so I don't think lights will set the minimum void size. I have seen people mention downlighters that are only around 20mm. Any wiring needs a minimal gap. An insulated 15mm water pipe ends up 13+15+13=41mm (22mm --> 48mm) so that suggests a 50mm ceiling void. Not needed, but waste pipes are "40mm" typically, but at solvent well joints mean it would need 50mm plus any fall. I don't need any of this though. Seems like the water pipes are the driving factor. I could take a long route to avoid having the water pipes in the ceiling void. Would it be bold to have a 25mm ceiling void? I was thinking 50mm was best, but with timber prices having gone nuts, I expect 2x2 to be double the 90p/m I paid in December and it needs a fair length as I expect to install at 400mm c/c. I could have a larger void (50mm) in the rooms that the water pipes would need to pass through and a smaller void (25mm) in the other rooms.
  16. Wow, that was close. It came down to having less than two rails to spare and I feel I put it in everywhere it was needed. I also worked out that you can ream the Nu-Heat 14mm clip rails out to 16mm using a 16mm forstener bit. Thanks for the suggestions, but looks like I'm good and the screeders are now doing their thing. Pressure test was started last night at >9pm.
  17. Amazon have sticky back for Wednesday and Screwfix is 24-48 hour unfortunately. The JG-Speedfit is 15mm. Ambiente may be an option. But time isn't on my side to head to the other side of Hatfield. Fingers crossed.
  18. I urgently need a small quantity of clip track. I thought I had over ordered but think I have come up half a dozen short. If anyone has some left over from their install near South Cambridge it would be awesome if I could buy it off them. I've been using the Wunda clip track, but as long as it is for 16mm pipe and self adhesive it should be OK. It can't have barbs on he back for sticking into insulation. Thanks
  19. So the edge foam was outside the constructional hearth area? I have a inglenook so think anything inside that counts as the constructional hearth area
  20. I'm trying to make it one. The other WBS can have 12mm but one unsure so want constructional hearth
  21. 75mm < required 125mm minimum noncombustible depth
  22. It's not fully below slab, but comes to the surface. It will then have a noncombustible 75mm over the top. Looks like Knauf do mineral wool perimeter insulation so that could work but it expect the screed would soak in.
  23. Back wall is brick so not getting plasterboard. I'm supposed to have something between the screed and wall to cope with 'expansion'. Sure it doesn't need to be thick, but should be noncombustible which the foam isn't. Is there something thin and compressible that is? I thought of trying to creat this with wood sheet. 'oilboard' could be an option as has a smooth face, but I have to be certain I can get it out afterwards so I'd rather something noncombustible I can leave in.
  24. I think I need something there for expansion
  25. The depth should be fine, it's round the edge between wall and floor I'm concerned about. I've seen some links that say 125mm depth for constructional hearth and I'll have that. One WBS will definitely be 12mm compatible but not certain of the other.
×
×