Jump to content

Recommended Posts

Posted

Anybody any experience with installing a sunken or semi sunken bath? 

 

Considering a partially sunken one in our ensuite, not by much, maybe 300mm.

 

Are there any obvious considerations or issues with this? Building control regs? Will be on first floor... Concrete floors but would build up that part in timber. Boot room below and we've 2700mm ceilings so not concerned about losing head height.

Posted

In general a step up to a raised area of bedroom floor or raised en-suite will be easier than cutting holes in the floor itself, since the former will be less disruptive to the structure.

 

Ferdinand

Posted

Sorry, forgot to say the bath is under a sloping ceiling, part of the reason of having it sunken, we can move it a bit further under the eaves, freeing up a bit more space for he shower area.

Posted (edited)

Yep, been there, done that! The floor of my bath is level with the tiled floor in the rest of the bathroom.

 

The pir is directly under this red Poly Pipe panel. I've 150mm pir total. 50mm sitting on top of 100mm.

 

SAM_3094

 

Marine ply tray set into the pir by cutting the Poly Pipe tray and removing the 50mm layer. So my bath has 100mm PIR underneath.

 

Slot cut for 50mm waste too:

 

SAM_3261

 

Waste foamed in:

 

SAM_3266

 

SAM_3267

 

A142 mesh down, ready for concreting:

 

SAM_3276

 

I taped over the ply box with DPM:

 

SAM_3345

 

Concrete in pre floating:

 

SAM_3352

 

Drying, DPM piece removed:

 

SAM_3398

 

A bit of grey floor paint, bath frame going in:

 

20170110_201438

 

SAM_4901

 

Custom made feet!

 

20161220_215816

 

Being tanked:

 

2018-12-08_10-30-55

 

Trap access - should have made a bit easier tbh but didn't account for all the 20mm conduits in there for the lights:

 

20190101_191055

 

Finished.....'ish...

 

20190210_170955

 

:)

Edited by Onoff
  • Like 1
  • Haha 1
Posted

Thats roughly what I was thinking. Bring the concrete floor over to the wet area, shutter it off and then build a frame to take the bath and shower area. Build the frame for the bath then screed rest of the area around it with a fall for the shower. Very helpful.

Posted
3 minutes ago, AnonymousBosch said:

@Onoff, please come to sunny Lancashire and do both our bathrooms! Please.

I'll buy you a pint, honest.

 

Do they do Lancaster Bomber on draught?

Posted (edited)

C/w bath side shelf for oversize, girly lager glass!

 

20190107_190502

 

PRE sticking the tiles down I might add!

Edited by Onoff
Posted
20 minutes ago, Construction Channel said:

I hope you leveled that up when you laid it. 

 

Tiling is not my forte! Worst bit of the whole job.

 

20190218_201706

 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...