Building Control - can i assume they agree if they dont reply?

Featured Replies

I send a lot of stuff (pictures, drawings etc) to my building control officer (private, Stroma), I rarely receive acknowledgement but otherwise he turns up when I call for an inspection.

Is there some time period after which I can assume he doesn't object to what I have done / am proposing to do?

Its generally minor stuff, but the build has to move on and my time is limited so I don't want to chase him every time but i'm worried that I could cover something up and then he'll come back later and say it's not ok. I'm guessing that if something is wrong, I would have to correct it, but if there wasn't evidence of something (so no evidence it was right or wrong) could I say they have missed their opportunity?

Take lots of photos.

They should be inspecting foundations and drainage, superstructure and insulation, first fix and completion.

They won't be interested in assisting you with your self build questions and it should already be detailed in your full plans submission.

Where are you on this project?

Didn't they give you a list of stages they wanted to see in particular? I know some private BC's assess the scheme and decide on the riskier bits they want to inspect and advise accordingly.

  • Author

Yes i've got the main inspections, but I mean all the stuff in between. Example - I have applied waterproofing paint to my basement, i've sent some photos of it but no reply. Can I just crack on and backfill it? Perhaps i'm worrying too much, just trying to gauge things.

If nothing was raised on the plans inspection, you could assume that as long as you build what is on the plans you will be fine. Often they don't like to cover waterproofing if they are also doing warranty inspections and ask that you get 3rd party insurance warranty on those elements. Get the inspectors contact number or email and ask him to confirm any specific concerns.

Post Grenfell everyone in the industry is ultra cautious. I am surprised anyone is prepared to be a building inspector, architect, developer etc with the amount of litigation and the ever increasing long tail risk.

Edited by Mr Punter

4 hours ago, Ed_ said:

Yes i've got the main inspections, but I mean all the stuff in between. Example - I have applied waterproofing paint to my basement, i've sent some photos of it but no reply. Can I just crack on and backfill it? Perhaps i'm worrying too much, just trying to gauge things.

This is a mine field, often self builders think that because BC pass something the work is ok.

Now both private BC's and public BC have big disclaimers in their terms and conditions. Their job is to occasionality check to see if you are complying with the spirit/ intention of the regulations and what you declared on the drawings. The onus is always on you to comply in detail with all the building regs, (which also include standards of workmanship for example) it always falls back on you, even if something is not shown on your drawings!

Even if BC miss something the fine print leads back to you carrying the can! Planning decisions are binding, BC have a lot more slack and room for manoeuvre.

Often self builders, extenders etc get caught out as they go off and "do their own thing". If your BC is not responding then the design liability and onus still unfortunately falls on you, even if they are giving you a shite service! Check the T&C's.

Main thing here is that if you want to press on you need to be sure in your own mind that any work you have undertaken is properly designed and you can justify it if asked to do so later.

I feel for you but that is the commercial reality.

2 minutes ago, Gus Potter said:

This is a mine field, .............

You have expressed what I was thinking in a far better way than I would!

9 minutes ago, Gus Potter said:

This is a mine field, often self builders think that because BC pass something the work is ok.

Now both private BC's and public BC have big disclaimers in their terms and conditions. Their job is to occasionality check to see if you are complying with the spirit/ intention of the regulations and what you declared on the drawings. The onus is always on you to comply in detail with all the building regs, (which also include standards of workmanship for example) it always falls back on you, even if something is not shown on your drawings!

Even if BC miss something the fine print leads back to you carrying the can! Planning decisions are binding, BC have a lot more slack and room for manoeuvre.

Often self builders, extenders etc get caught out as they go off and "do their own thing". If your BC is not responding then the design liability and onus still unfortunately falls on you, even if they are giving you a shite service! Check the T&C's.

Main thing here is that if you want to press on you need to be sure in your own mind that any work you have undertaken is properly designed and you can justify it if asked to do so later.

I feel for you but that is the commercial reality.

To add a bit @Ed_ I really feel for you, you were /are not expected to know you would not get the level of support you deserve. You're a self builder, a domestic Client and the professionals should and really need to take that into account and know better. I grinds my gears when I see this. I know that for example folk that are not "in the industry" require more support. In fact it's written into the IStructE guidance for SE's.

It's not an abstract thing and the same standards should apply to BC.

Don't forget that to become a Senior BC officer you need to gain advance qualifications and exercise professional standards.

14 minutes ago, -rick- said:

You have expressed what I was thinking in a far better way than I would!

I've probably not captured it all, gave it my best go, probably a bit rough, always wonder, did I pitch it right, try to encourage but also warn of the pitfalls! Feel free to add your thoughts/ reword.

There are lots of other professional folk / seasoned self builders / Contractors ect on BH that can expand! I know I'm not the only voice. I do know there are lot of other members with more experience than I in this field.

It's a subject really worth exploring here on BH to keep us all up to date as after Grenfell and the new designers obligations (ref CDM / Principle Designer) for example lots of folk offering design services have revisited their T & C's.

Edited by Gus Potter

In my jurisdiction we have statutory inspection that we must - as BCOs - see. These include foundations, DPM, DPC, drainage and sound-reducing measures. If theses works are covered at the time we inspect we can ask for the works to be uncovered and/or for photographs as evidence of the works provided to us.

It might be a good idea to ask your BCO for a list of inspections he/she is legally obliged to carry out.

If in doubt don’t cover anything up until your BCO has carried out an inspection.

  • Author
2 hours ago, Gus Potter said:

it always falls back on you

Don't worry I'm aware of this, at the end of the day it's me living there and me that will have to deal with any cock ups I make!

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.