Friday at 09:533 days My build has no masonry walls upstairs (1st floor). My structural plans state that I'm to space my studs at 400 lateral centres and 600mm vertical centres with 11mm osb fixed to one side with screws at 150mm spacings.Merchants plasterboard is metric 1200 x 2400Merchants ply and osb is imperial 1220 x 2440I can't think of any other way of working it than ripping the ply down to match the metric dimensions. Is this standard?
Friday at 09:573 days 2 minutes ago, ruggers said:Merchants ply and osb is imperial 1220 x 2440That must be their choice to buy in imperial, mine was metric. plenty of places offer metric maybe fewer doing Imperial.
Friday at 10:223 days It's pretty normal tbh. a lot of merchants still stock 8x4 imperial OSB and ply, but metric 1200 x 2400 OSB3 is easy enough to get if you ask around, so its worth ringing a couple of places before you start cuttingIf you do end up with imperial sheets, ripping them down is what most people do. The reason it matters is your engineer has gone for OSB at 150 screw centres so it's doing racking work, and for that every sheet edge needs to land on a stud or noggin with proper fixing. On a 400 grid a 1220 sheet runs 20mm past the stud and by the second or third sheet your joints are well off the studs. Same on the height, 2440 overshoots your 600 noggin spacing by 40mm.Taking 20mm off the width with a track saw or a circular saw and a straight edge is quick enough once you've set up for it, do them all in one go rather than as you need them. Leave a gap of about 3mm between sheets for movement.Plasterboard on top then just needs its edges on studs too, and it's no bad thing if the board joints dont line up with the OSB joints.
Friday at 10:522 days Or you ask your se if the studs can be at 610 and 406 centres.Almost certainly the answer is yes.
Friday at 11:592 days 1 hour ago, saveasteading said:Or you ask your se if the studs can be at 610 and 406 centres.Almost certainly the answer is yes.You can't get imperial plasterboard, so best at 400 / 600ctrs. Edited Friday at 11:592 days by Mr Punter
Friday at 12:052 days 1 minute ago, JpManning said:and it's no bad thing if the board joints dont line up with the OSB joints.You want to actively avoid this. Prevents lots of cracks appearing, and is generally seen as “good practice”.
Friday at 12:252 days 18 minutes ago, Nickfromwales said:You want to actively avoid this. Prevents lots of cracks appearing, and is generally seen as “good practice”.Fair point Nick, I put that too softly. Staggering them on purpose is the way to go so a plasterboard joint never lands on the same stud as an OSB joint. If they line up any small movement in the sheathing shows straight through as a crack in the finish, and you get abit of that anyway as the timber dries out over the first winter with the heating on.Easy enough to plan for, just start the plasterboard with a sheet cut down by one stud spacing so all its edges fall on different studs to the OSB edges
6 minutes ago6 min Author Thanks everyone.I'll try and source metric 11mm osb from a different merchants, but if I cant, at least i know i can rip it down.Im starting the vertical studs today. Just figuring out what the best length nails are for the gun. I have 90s but dont want to go through the top side of the header fixing the studs and puncture the membrane. Either syeeper angle or slightly shorter nails?
Just now1 min 3 minutes ago, ruggers said:Either syeeper angle or slightly shorter nails?You shouldn't have to think about it, so shorter nails.You'll send a lot less time sourcing metric osb than cutting down imperial and get a better finish.