Self build dream turning into unaffordable nightmare

Featured Replies

Because this is a self-build site, OHP and prelims tend to be low.

I think given that you do not wish to have any input into the construction you may have to go with a main contractor and swallow the 15%.

I would be disappointed in my architect suggesting a builder who increased their price by 12% for a 6 month delayed start.

As others suggest, I think QS the job to make it easier and reduce risk for the builder and re-tender.

  • Author

Prelims, along with demolition were running at £200k. Is that high @Mr Punter ?

TBF our architects were extremely disappointed in the builders.

How do I use a good QS and will the architects be happy to work with them on thd tender? What is a typical fee for them?

2 hours ago, mrcerec said:

Why the QS managing the tender process and not the architects.

Because you need someone with experience of keeping costs under control and I don't think your architect has shown much sign of try to do that...

10 hours ago, mrcerec said:

budget of £750k... 3 great schemes, but cost £1.8m for our preferred one... pet builder who advised it probably could be built for £1.4m... That was Spring 2024.... September 2025. Design/build with pet builder £1.8m. Went out to tender... £2m! ...

Value engineered. Cut back on some finishes. Pet builder now £1.7m as of August 2026... call from the architect yesterday to say that builder now wants another £200k

@mrcerec You didn't answer this important question from @torre

2 hours ago, torre said:

Do you have plans approved by building control?

&, "Have you demolished yet?", is less important, but will help the thread along.

I'm following this thread with great interest in the hope that it will help me with my own project, which is very much not going to plan either. @mrcerec's most recent question is on the previous page now (for me, anyway), so I'll just remind the BH experts, it would be good to know:

How do I choose a good QS and what should I expect to pay?

5 minutes ago, mrcerec said:

Prelims, along with demolition were running at £200k. Is that high @Mr Punter ?

Hard to say. It depends how long the job will take. Your best bet is to get some more quotes and get you architect or QS to check them. And Claude / ChatGPT.

It is not unusual for a self builder to part ways with the original architect and sack a number of builders along the way.

If the housing economy takes a downturn, which is quite possible, builders should become cheaper to employ.

  • Author
36 minutes ago, Tony L said:

@mrcerec You didn't answer this important question from @torre

&, "Have you demolished yet?", is less important, but will help the thread along.

I'm following this thread with great interest in the hope that it will help me with my own project, which is very much not going to plan either. @mrcerec's most recent question is on the previous page now (for me, anyway), so I'll just remind the BH experts, it would be good to know:

How do I choose a good QS and what should I expect to pay?

It was planning conditions discharge that F'ed the timings up. Council was meant to take 8 weeks.... had to clarify a couple of points re trees but it is all but there.

Demolition hasn't happened yet. Would be interested to hear what people think the costs should be for a 2 storey 400 sqm house

  • Author
37 minutes ago, Mr Punter said:

Hard to say. It depends how long the job will take. Your best bet is to get some more quotes and get you architect or QS to check them. And Claude / ChatGPT.

It is a 60 week build

3 hours ago, mrcerec said:

over the top in your opinion

Yes. I can't claim to always be right, and our own current project is well over budget.

But I've experience of what feels right and that seems well ott.

You having see what I wrote about flat roofs etc have you? Maybe the new format of BH deletes drafts and I hadn't posted it.

3 hours ago, Alan Ambrose said:

Ask your architect for the breakdown, i.e. how they reached that figure ... and their eyes will usually glaze over.

So cruel.

My worry is that they just shrug.

They will have used £/m2 out of a publication.

What stage are you at? Sounds like the structure is basically there but a long way to go.

Do you have detailed drawings or is the Architect relying on the builder to make it work? Who liaises with the bco?

Is it a registered Architect with capital A?

I detest flat roofs because of drainage, but then I'm a philistine, and dong like leaking roofs. The drawings don't show rainwater pipes, so are they indoors?

You've lots of glass, flat roof, presumably upmarket spec, and an expensive area.

Thus £1.2 to £1 5M is not out of the question. 1.9 is crazy.

You need a firm but fair meeting with the Architect where you ask the sensible questions above, and write down the answers.

Do you have a friend or other person of authority who could sit in and simply listen?

Is there any contract?

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.