I'm getting all of the sand for our brickwork delivered in one load and I want to make sure that there is no variation in mortar colour.  We are having a 5 sand, 1 cement, 1 lime mix.  Should I simply buy 7 buckets to ensure they all get filled before be discharged into the mixer?

 

What have others done / insisted is done?

 

Posted
31 minutes ago, carlos21 said:

Why would there be a variation in colour?

If you throw sand and cement in a mixer using a shovel, isn't there a risk that each batch will differ slightly, simply because no two shovel loads will contain the same volume of material?

Posted

I would not have thought the colour would change that much, but iam no expert, i guess just try it out for yourself, i recon 7 buckets would be annoying, 

Posted

Bucket gauge is good. Normally have 1 bucket and count them bur I can see your thinking minimise the risk. Normally a cement bag cut in half is 1 mix so then get 6 buckets. Are you making the brickie mix up or has he got a joey?

Posted

I would say the biggest risk to colour variation is what sand and cement you use so having all the sand in one load is good.  Make sure the cement is the same make and supplier throughout.  I have used some that was very inconsistent in colour.

 

Shovelling lime into a gauging bucket before chucking it into the mixer is a horrible job, but they should have paid more attention at school.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...