Caroline Posted Friday at 13:27 Posted Friday at 13:27 Hi Folks Building control has asked for this. I sent them a photo of the new treatment plant which replaced the old building that was demolished and replaced with new building and sent them the manufactures specification of the water treatment plant, but think they want something, but not sure what it is. Can anyone help please? We are waiting for our final BC inspection. Thank you.
Mr Punter Posted Friday at 14:28 Posted Friday at 14:28 Go back to the supplier/installer and ask for this. It could be a tag or EN number. 1
JohnMo Posted Friday at 14:31 Posted Friday at 14:31 Is this new potable water or waste water treatment. What does Document H actually say you need? If doesn't ask for anything tell them it doesn't.
Caroline Posted Friday at 14:33 Author Posted Friday at 14:33 1 minute ago, JohnMo said: Is this new potable water or waste water treatment. What does Document H actually say you need? If doesn't ask for anything tell them it doesn't. Yes it is new for our newbuild house. I don't really understand the "Document H". Hopefully, all will be well, I just don't think BC make it easy for self builders. Probably okay for those who have project managers/architects to hand!
Gone West Posted Friday at 14:45 Posted Friday at 14:45 @Caroline Is it to do with this bit of Part H. (3) Where a foul water drainage system from a building discharges to a septic tank, wastewater treatment system or cesspool, a durable notice shall be affixed in a suitable place in the building containing information on any continuing maintenance required to avoid risks to health. 1
saveasteading Posted Friday at 18:43 Posted Friday at 18:43 If I remember properly, I read it that I would put a notice up in a suitable place , such as in a services zone, so that any future owner or maintenance orsin would have it explained. Ie just an explanation of the system. More formally it would also be in a maintenance manual, but that would get lost. 1
Gus Potter Posted Friday at 23:26 Posted Friday at 23:26 (edited) 9 hours ago, Caroline said: Building control has asked for this. I sent them a photo of the new treatment plant which replaced the old building that was demolished and replaced with new building and sent them the manufactures specification of the water treatment plant, but think they want something, but not sure what it is. Can anyone help please? We are waiting for our final BC inspection. Post what they are asking for. One thing about dealing with planners and BC is that you can end up being a useful idiot. Some treat you as a bit of CPD on their CV! Some make the mistake of providing info that just opens a can of worms.. again you become a CPD candidate. Now actually I have a good relationship with the planners, BC, locally I have known some for 40 years or more.. when we just were kids. Think about the balance.. you want to be helpful but not too much in writing. If you can the best way is to lift that old thing called the telephone and have a chat. Edited Friday at 23:27 by Gus Potter 1
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now