saveasteading Posted 3 hours ago Posted 3 hours ago On 05/09/2026 at 19:03, BotusBuild said: then upped the water A bad thing to do. Explained elsewhere many a time. The driver is not allowed to do that without your signature. So when it cracks it is not their liability. How flat and level do you want it? The standard test is that you don't see any 3mm gaps under as 3m straightedge whatever the position and direction, even pressing down one end. A slight slope might not matter to you. 30mm is a lot of screed.
BotusBuild Posted 2 hours ago Author Posted 2 hours ago 38 minutes ago, saveasteading said: A bad thing to do. Explained elsewhere many a time. The driver is not allowed to do that without your signature. So when it cracks it is not their liability. Clarifying. The "wall" was dryer than standard. Then he upped the water to get to right mix. Levelling the "wall" was hard work in the heat, but it has all set off well and no cracks (that i can see throught the current muddy puddle!!) See above about my want for level. Its not got to be billiard table, but better than it is.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now