Jump to content

Caulk between wall and ceiling


Super_Paulie

Recommended Posts

As I'm at the decorating stage, got a question for you guys. 

 

I have a hefty steel beam, with a small, maybe 2 inch section of plasterboard and skim above it and then the ceiling. Although this joint is fine currently, I'd imagine the house is still settling and thus the join will likely crack, no doubt as soon as I'm finished decorating. 

 

Would it be an advantage to mist coat, then go along the wall/ceiling join with decorators caulk before my final coats of paint? In my mind this will add a flexible joint in that section that will crack if it's just skim. 

 

Any opinions?

IMG_20241207_111927.jpg

  • Like 1
Link to comment
Share on other sites

50 minutes ago, saveasteading said:

Was that previously a railway bridge. What a lot of bolts...but I like it.

Is it/ Does it need to be fire protected?

It's almost heavy enough that it doesn't  but not a lot of people know that.

Thats how my mega steel was like … 

Link to comment
Share on other sites

yeah its an absolute beast, 305x305. What can ya do, the engineers calculations came back with that and i aint gunna argue as we love it and everyone who sees it says how mad it is, a great talking point. Its marked "British Steel", id imagine it sat as surplus from a car park before it ended up in my house. Yeah it needs fire protecting, thats a christmas job.

 

Anyways, so caulking the corners is not something to do? i'll just leave it then and caulk in the future when/if it cracks.

Link to comment
Share on other sites

3 hours ago, nod said:

It won’t make any difference 

wait 12 months 


Exactly this. I even used flexible repair tape over the areas I knew would crack and they still cracked. While the temptation to repair them again is strong my intention is to leave it until the summer and do it then. We have very few cracks in the plaster generally though. 

Link to comment
Share on other sites

1 minute ago, Super_Paulie said:

yeah its an absolute beast, 305x305. What can ya do, the engineers calculations came back with that and i aint gunna argue as we love it and everyone who sees it says how mad it is, a great talking point. Its marked "British Steel", id imagine it sat as surplus from a car park before it ended up in my house. Yeah it needs fire protecting, thats a christmas job.

 

Anyways, so caulking the corners is not something to do? i'll just leave it then and caulk in the future when/if it cracks.


It’s not just the settlement is the drying out. A new building holds a lot of moisture and can take a long time to dry out. I’ve read on here it can be a year or more. I caulked a door frame join using plenty of caulk and made a nice neat job of it. It was a waste of time as it cracked the full length of the join. 

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...