Does this make sense? Piled raft cross-section


AppleDown

Recommended Posts

Looking at the cross-section we have from our Architectural Technician for our piled raft. Before I go back with questions - his inclusion of a 'pile' on the edge of the concrete makes it look like the timber frame is floating on nothing. Am I right in thinking the raft needs to extend under the timber frame wall and dwarf block wall, and then add some insulation outside of that? Also, what does the DPM do? Then you have the perimeter build up next? Or am I taking crazy pills?

 

Screenshot 2024-12-12 at 22.10.36.png

Edited by AppleDown
Link to comment
Share on other sites

The actual design will need to be done by a Structural Engineer 

Im not sure why the Architects would get involved with foundation design Not really there bag 

  • Like 1
Link to comment
Share on other sites

10 hours ago, AppleDown said:

Looking at the cross-section we have from our Architectural Technician for our piled raft.

 

That's not a raft foundation. Is the technician calling it a raft, or is that an assumption you have made. Yes, to be a raft, what is shown currently as a concrete slab needs to extend under the load bearing walls.

 

If you are after an insulated raft and require it to be supported with piles due to ground conditions, that's quite niche. You'll need someone with proven experience.

 

I'd recommend having a chat with Advanced Foundation Technology:

 

https://www.advancedfoundationtechnologylimited.co.uk/our-products/timber-steel-icf-framed-building-foundation/

 

groundshield-L-on-piles.jpg

Edited by IanR
  • Like 1
Link to comment
Share on other sites

32 minutes ago, nod said:

The actual design will need to be done by a Structural Engineer 

Im not sure why the Architects would get involved with foundation design Not really there bag 

I totally understand the piles and slab will be designed by a SE who knows what they're doing (that's happening at the moment), but in the actual details of what's shown for the slab to wall junction, and how it's supported - are my assumptions correct? If the slab extends to under the upstand blocks, is that how it should look? And if so, what's the route of the DPM?

Link to comment
Share on other sites

Worrying really. That drawing is pointless, as a proper expert needs to take over. You can see the issue so why can't your technician?

The note should say " do not use this drawing".

They dabble with mentioning eccentricity of the load.

Who even says it needs piling?   The choice of pile could change that whole design. Does the floor sit on ground, not piled?

 

If you have a ground report can we see it?

  • Like 1
Link to comment
Share on other sites

3 minutes ago, IanR said:

 

That's not a raft foundation. Is the technician calling it a raft, or is that an assumption you have made. Yes, to be a raft, what is shown currently as a concrete slab needs to extend under the load bearing walls.

 

If you are after an insulated raft and require it to be supported with pikes due to ground conditions, that's quite niche. You'll need someone with proven experience.

 

I'd recommend having a chat with Advanced Foundation Technology:

 

https://www.advancedfoundationtechnologylimited.co.uk/our-products/timber-steel-icf-framed-building-foundation/

 

groundshield-L-on-piles.jpg

Sorry, that's just me using the term - can call it slab. As above - if the slab extends to under the supporting dwarf wall upstand, is that then correct? Where does the DPM meander through?

Link to comment
Share on other sites

Just now, saveasteading said:

Worrying really. That drawing is pointless, as a proper expert needs to take over. You can see the issue so why can't your technician?

The note should say " do not use this drawing".

They dabble with mentioning eccentricity of the load.

Who even says it needs piling?   The choice of pile could change that whole design. Does the floor sit on ground, not piled?

 

If you have a ground report can we see it?

It definitely needs piles. GR has been sent off to about 10 different people - including AFT and Tanners, and all suggest it either needs replacing down to 2.5 metres with new ground, or piles. Piles is easier and cheaper. The design for loadings has been done, so they know where and what depth to place them at. I'm just trying to work out if that drawing makes any sense - as my understanding is based on what's on the forum and what an initial part-time PM is telling me. If the slab extends further, is that all that needs looking at - or are there other glaring mistakes?

Link to comment
Share on other sites

31 minutes ago, AppleDown said:

Sorry, that's just me using the term - can call it slab. As above - if the slab extends to under the supporting dwarf wall upstand, is that then correct? Where does the DPM meander through?

 

No, the insulated "slab" can't extend under and take the external wall loads (making it a raft) while sitting on PIR and without a suitable build up under the raft (see AFT examples at link I provided)

 

What's missing in the AT's sketch is the pile capping/beam that joins the top of the piles for the dwarf wall to sit on. Giving the AT the benefit of the doubt, the rectangle they've drawn is intended to cover the piles and beams.

 

What have you asked for with regards the floor/foundation. There appears an attempt to go above building regs regards insulation, but there are better ways of doing it. 

Edited by IanR
  • Like 1
Link to comment
Share on other sites

Just now, IanR said:

...

What's missing in the AT's sketch is the pile capping/beam that joins the top of the piles for the dwarf wall to sit on. Giving the AT the benefit of the doubt, the rectangle they've drawn is intended to cover the piles and beams.

....

 

Beat me to it Ian.....

  • Like 1
Link to comment
Share on other sites

There are very likely much better ways to do this, but we are dabbling unless we know the site, the job, and see the ground report.

 

@AppleDownsending to 10 people is wasting a lot of people's time or, they won't answer.

You need a design expert who works for you. Your chosen SE should suffice for now.

1. Get the slab built

2 put a house on it.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...