Jump to content

Drying time for pavement?


puntloos

Recommended Posts

Council builders just came by and finished my driveway (kerb lowering but they redid most of it). 

But no note left - what guidance do we have for how long this needs to dry/set? 3 days? 5? week? Depends on how rainy? 

With a previous (poor) job, I had some paving that when you put your foot on it and twisted, you could easily twist loose stuff 1.5-2 weeks later, but maybe that's normal?

 

Suggestions? When can I drive my car over this?

(not to mention: people in spikey high heels?)

image.thumb.jpeg.0547b89de95221371c01c7ace5dc79d0.jpeg

 

Link to comment
Share on other sites

7 minutes ago, ProDave said:

Tarmac you can drive on straight away even if still hot.

It depends on the specification , the wheel size, and what is under it.

That is not highway spec, (no big stones) and I would leave it a day at least.

 

Was it hot? that goes hard quickly. If it was cold lay, then

10 minutes ago, ProDave said:

Tarmac

Macadam implies a design mix of stone, like type 1, Tarmacadam is the same mix glued together by a small amount of bitumen. Very Strong.

the stuff in the picture is  a thin dressing. Might be ok already , but don't turn the wheels on it while at rest for a while.

 

Link to comment
Share on other sites

5 hours ago, Onoff said:

Periodically walk over it then though the house, preferably over a light coloured floor covering. SWMBO's reaction will help you gauge whether it's dry or not.

 

 

Instructions unclear, am now tarred, and birds are eyeing me funny. Should I crawl inside?

Edited by puntloos
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...