iMCaan Posted March 22 Share Posted March 22 (edited) Hi Our first floor has UFH and is made up of 50mm screed, 25mm insulation, 100mm infill concrete blocks B&B. The entire floor is screeded including where the shower waste will be placed in the wetroom. The wetroom has UFH but not where the shower waste will be fitted. The idea is to cut the screed to fit the shower waste/drain. The waste pipe will run underside of the FF floor (within GF dropdown ceiling to external wall). I was considering the tiled linear wetroom waste like the attached. However, these have horizontal outlet pipes, which has put me in doubt that they may not be the best option. This horizontal outlet pipe doesn't drop down enough to go through about 175mm of concrete floor. Is there an alternative product? What would be the best way to approach this? Some of these linear waste pipes are ridiculously priced £250+ (even so some at around £375) others are around ~£70. Any recommendations? Thanks Edited March 22 by iMCaan Link to comment Share on other sites More sharing options...
crispy_wafer Posted March 22 Share Posted March 22 how about something like this from schluter? Schluter KERDI LINE V/VS/VOS Linear Drains - Tiling Supplies Direct Link to comment Share on other sites More sharing options...
iMCaan Posted March 22 Author Share Posted March 22 Thank you. I didn't know the vertical trap linear drain was available on the market. Quite dear though. Link to comment Share on other sites More sharing options...
crispy_wafer Posted March 22 Share Posted March 22 Yes, I guess. If the horizontal is that much cheaper and if you've got room for manoeuvre then I guess a 90 to change the angle and then a straight bit of pipe down might work?? Link to comment Share on other sites More sharing options...
Russell griffiths Posted March 22 Share Posted March 22 If you have already screeded the floor, how are you going to get the water to run to that drain ?? if you want a square 150x150 stainless grating then mcalpine do a good selection. Link to comment Share on other sites More sharing options...
iMCaan Posted March 22 Author Share Posted March 22 28 minutes ago, Russell griffiths said: If you have already screeded the floor, how are you going to get the water to run to that drain ?? You're right, the screeded floor is level. I need to work that one out. The tiler said he can get level correct for the water to flow to the drain. I'm meeting him tomorrow so I'll ask him how. Link to comment Share on other sites More sharing options...
Trojan Posted March 22 Share Posted March 22 He'll just be building the floor up with adhesive I'd assume Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now