GreenGables Posted March 3, 2023 Share Posted March 3, 2023 We have a double Eclisse pocket system. The jambs have been installed to sit on the screed, while the inner frame is propped up a little. Is this correct? Once the floor goes in I will have a passage height of 1955 max which seems very low. Should the jambs and frame be sitting at finished floor height? Many thanks Link to comment Share on other sites More sharing options...
Dave Jones Posted March 3, 2023 Share Posted March 3, 2023 (edited) depends which size you bought. they do a non standard small 1981 high or a normal 2040 high. https://www.eclisse.co.uk/content/tech_specs/Tech Specs (Tolerance message)/DOUBLE FIRE-RATED SYSTEMS Update.pdf Edited March 3, 2023 by Dave Jones Link to comment Share on other sites More sharing options...
GreenGables Posted March 3, 2023 Author Share Posted March 3, 2023 The doors are 1981 so I guess the builder got the smaller height ones. Thanks Link to comment Share on other sites More sharing options...
Russell griffiths Posted March 3, 2023 Share Posted March 3, 2023 1981 should be measured from finished floor height, I sat my frames on a piece of100x25 to allow for 25mm of floor tiles. Measure up from your finished floor height. 1 Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now