Ahouseforus Posted May 9, 2022 Share Posted May 9, 2022 Hi, I am new here and wondered if anyone had any advise of the following. We are completing a self build for the first time, its timber frame with a block and render outer. We have been careful to use a VCL over the whole of the inside and also in the loft also, all joints taped (I hope well enough). I am nervous a about the airtest and have been reading that I need to seal the plasterboard to the floor before finished floor then skirting, which will also be sealed. What do I do here, seal with mastic type product or is there something else? Many thanks Link to comment Share on other sites More sharing options...
ProDave Posted May 9, 2022 Share Posted May 9, 2022 You should not need to if the air tight layer behind the plasterboard has been done properly. Link to comment Share on other sites More sharing options...
Ahouseforus Posted May 9, 2022 Author Share Posted May 9, 2022 Thanks for getting back. With the floor wall junction, we lapped the VCL over the DPM and taped. Then has a 25mm upstand around and then another DPM for UFH and screed. Link to comment Share on other sites More sharing options...
Russell griffiths Posted May 10, 2022 Share Posted May 10, 2022 For £300 just get it tested and see how it fairs. , fix as needed. Link to comment Share on other sites More sharing options...
Ahouseforus Posted May 10, 2022 Author Share Posted May 10, 2022 (edited) We are having an assessment from a company then will go with that if it’s recommended. Edited May 10, 2022 by Ahouseforus Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now