June 25, 20206 yr I wish one day to have an electric car . There’s a multitude of different chargers , but as I don’t have the vehicle nor the charger I can’t select anything . Presumably it’s just a meaty cable off the consumer unit to the charger ? To future proof what’s the meatiest cable I could put in even if it’s overkill ? ?? Edited June 25, 20206 yr by pocster
June 25, 20206 yr 14 minutes ago, pocster said: To future proof what’s the meatiest cable I could put in even if it’s overkill ? ?? Maximum single phase charger is 7Kw from memory so 10mm is what they seem to specify. Can you not get near the meter as ideally you should not run this via the CU
June 25, 20206 yr I still think we are at the VHS / Betamax stage with car chargers. I do hope one day there will be be one standard charger?
June 25, 20206 yr 23 minutes ago, pocster said: Sorry you’ve lost me . Surely it runs from the CU or some big ‘trip’ ?? ? They suggest you don't run large loads for long periods through a CU - this is a load that runs at full power for hours.
June 25, 20206 yr Author 1 minute ago, PeterW said: They suggest you don't run large loads for long periods through a CU - this is a load that runs at full power for hours. Ah I see !
June 25, 20206 yr 1 hour ago, PeterW said: They suggest you don't run large loads for long periods through a CU - this is a load that runs at full power for hours. what's the logic behind that? Surely the charger's supply needs protection and and MCB is an MCB whether it's in the main CU or another box...
Create an account or sign in to comment