Jump to content

Recommended Posts

Posted

I'm building a driveway that is on a steel platform with beam and block on top of that. Is it OK to screed this and use it for storage (no vehicle traffic)  before putting the concrete / mesh top on it for a few months? Or should I wait another couple of weeks and get the concrete on first? Just not sure how stable this is with a screed on.

Posted

If you can't concrete it now how about a large thick tarp? Put some blocks on it to stop it blowing away.

  • Thanks 1
Posted

You can load out a beam and block floor that has where you just brush in a lean mix grout.  The concrete would give added strength but you should be OK.  The supplier should advise on max loadings.  I have seen one fail but they had staked blocks 2 packs high x 2 along one beam and the floor had not been grouted.

  • Thanks 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...