Everything posted by DevilDamo
-
If in doubt, ask (the engineer to provide you with a detail).
-
Hard & soft landscaping scheme planning condition
DevilDamo replied to flanagaj's topic in Planning Permission
Maybe to you but not in these current days of biodiversity and ecological enhancements. Look on the LPA’s website for other similar schemes so you will get an idea as to the level of detail required. -
What jurisdiction does the BCO have over a Planning condition?
-
Datum Point. How to measure Site Levels. Advice needed
DevilDamo replied to james505's topic in Surveyors & Architects
If it does not specially state ordnance datum levels, then set your own starting with 10.000m for example. -
Which would have different requirements than a single storey (bungalow) dwelling. The number of storeys dictate the means of escape requirements.
-
Is yours a single, two or three storey dwelling?
-
BNG de minimis exemption for self build in garden
DevilDamo replied to Fi and J's topic in Planning Permission
Yes, correct and makes sense. Different obligations and requirements but both enforced by the relevant LPA (where applicable). -
-
BNG de minimis exemption for self build in garden
DevilDamo replied to Fi and J's topic in Planning Permission
The CIL paperwork itself a charge on the property/site. Some LA’s may ask applicants to enter into a separate legal agreement, but definitely not all. -
Many more than two things. It has to comply with Class E of the GPDO.
-
Help with kerb appeal of an existing house
DevilDamo replied to Sparrowhawk's topic in New House & Self Build Design
As above, search for traditional character properties for inspiration. ChatGPT can also be quite helpful. -
The author then 😄
-
And if there is not an Architect?
-
The author owns the file(s). The fact you have fallen out with your Architect, I cannot see them sharing any files with you.
-
Archaeological study brief instead of desktop study?
DevilDamo replied to Jane W's topic in Planning Permission
So was the report mentioned in the Pre-app response (as per your original post) or Outline Approval with conditions decision notice? If the latter, you have no choice but to submit one. The Outline Approval would take precedent over the Pre-app response. -
Archaeological study brief instead of desktop study?
DevilDamo replied to Jane W's topic in Planning Permission
Do you already have outline approval then? -
Archaeological study brief instead of desktop study?
DevilDamo replied to Jane W's topic in Planning Permission
What are you proposing? If it is required as part of the validation process, then it will be needed to be provided upfront. -
The 30sq.m doesn’t have anything to do with Planning. If you have Class E PD rights and the outbuilding complies with the PD requirements, then Planning would not be required. You could submit a Lawful Development Certificate application to confirm it is PD.