Jump to content

Lee woodfine

Members
  • Posts

    22
  • Joined

  • Last visited

Personal Information

  • About Me
    Hi, i am currently in the process of trying to build my hoping forever home and will possibly need some pointers in the future. First time self builder but been in the industry all my working life.
  • Location
    Kent

Recent Profile Visitors

592 profile views

Lee woodfine's Achievements

Member

Member (3/5)

6

Reputation

  1. Thank you for your feed back nod, just not too sure on pricing. He reckoned he could do the whole thing in 10-12 days. As I would be giving them the whole house to do without any stops. Not saying you can’t trust trades but as soon as you mention it’s a self build most of them think you are minted!!! Lol
  2. Ah thank you. i Had a quote to do the whole job supply as well for £10 per m2.... good ?? or bad ????
  3. Hiya, Am looking into getting some prices for my house to be plastered. There is about 340m square Of float n set and 350m square of skimming on plasterboard. Anyone throw some light on the subject as to good meterage pricing for the above mentioned?
  4. Hi any of you lovelies on here local to this and going over the weekend of 8-9 of February? we are going,( got our free tickets)
  5. All concreted in and ready for benching up,( this was just before the kid went on). Got the long pipework runs in on my side and never used so much pea shingle before in my life!!!!
  6. Haha, it’s called a long drop style loo!!! misplace ya footing an it’s defo a long drop!! bit rough around the seating area tho, tends to chafe a tad!!!
  7. Hi, no I got given the choice of st ps or not so went for no steps. It’s 1.75m down to the bottom so a small ladder will get you access. Have got about another 12ish inches to build up yet so just a brick topper to it to fit the cover.
  8. Very tough. my ground is soil for the first 18” then pretty much sticky clay.... needless to say I grew quite a few inches just walking across the ground. Lol
  9. Well little update. Had the foul drain installed over the last week, 2.5m down in the road and 7m of piperun. A week to complete except for the manhole access on my ground. lots more digging and 1.85m of concrete rings installed my me and my wife. done bloody well I might add. Haha. Just wanting to spread some happiness with progress. ????
×
×
  • Create New...