-
Posts
3691 -
Joined
-
Last visited
-
Days Won
25
Iceverge last won the day on December 3
Iceverge had the most liked content!
Personal Information
-
Location
Ireland
Recent Profile Visitors
6094 profile views
Iceverge's Achievements
Advanced Member (5/5)
1.5k
Reputation
-
Vapour..... It's like worrying about fog when rain is the issue. Airborne moisture carried by leaks through poor airtighness is the elephant in the room.
-
Install cross battens as a service batten and keep wires out of the roof!
-
Where the cost and time of past efforts make it mentally impossible to change course.
-
Mechanical ventilation of some kind is a must. Then airtighess. Then insulation. Do these 3 well and heating. Becomes an afterthought. Keep it as simple and efficient as possible. Another vote for rads. I would avoid tiles on the floor in any case. Horrible, slippery cold things.
-
Welcome welcome. UFH in a boat! I'm thinking downward heat losses might be an issue. How about warm to touch flooring instead like lino or carpet.
-
Not crazy about this. You're sandwiching layers of very low permeability. AKA foil faced PIR and the VCL. Yes in my preferred flat roof makeup with ventilation above the insulation. Any cheap breather/felt will do to throw any drips off the PIR.
-
Any pics to see what you're dealing with? The strip out and trouble you've gone to with planning thus far might lead you down the sunk cost fallacy. Beware.
-
Teething issues with MVHR
Iceverge replied to Tom's topic in Mechanical Ventilation with Heat Recovery (MVHR)
Is the unit itself directly on the floor? Maybe some rubber feet or paving slabs wouldn't go amiss. -
I helped my mate for free with the build, pouring concrete, groundworks, airtighess and some basic carpentry. I didn't do any of the fooling with the manual demolition though. I've learned the long way my time isn't worthless. I did offer to drive my digger straight through it though.
-
I cannot emphasis this enough. There'll always be more work to do than one person can manage and you need a metric to value your time. £ or € or $ is a pretty good one. Let me give you some examples. I stupidly chased our walls with a 9" grinder ( because I had it) rather than pay €120 for a days rental of the proper tools. It took me about 20 hrs of pure torture. My mate rented the machine and did his house in an afternoon. At €20/hr it stupidly cost me double what his did. I can lay blocks, but I'm slow and I don't like doing it for more than a couple of hours as I'm too soft. I reckon about 10/hr would be average. That come to about €2/block. Maybe that makes some sense for small projects but no way for a large house. Gains can be made where you do the donkey work of someone who's more highly skilled. Like UFH pipe laying or pulling cables for wiring. Plumbers and sparkles are expensive laborers. Another example, my mate, extended a cottage. 4 men took 2 days to crowbar and sledge down an old stone chimney. All unpaid, family, mates etc. then they took the same again to break out the old floor. Then the same to take off the roof. Had they hired a digger and demoed the house their mate time could probably have saved them multiples of the cost later in the build.
-
I'll reiterate my point buried in my earlier post. The worse thing that any self builder can do is value their time at zero. You need to put a £ figure on every hour you spend on site. Say £20. Re taking down the leaf of a cavity wall. @Gus Potter and @saveasteading might be along to discuss why this is a bad idea. As far as I understand the two leafs when ties together act more like a wide solid wall, like a "H" rugby goals. When you take away half almost all of the lateral strength disappears.
-
Any pics of the outside? Don't drop your phone!!!!!
-
I don't know if you remember. The plumbers originally installed it horizontally and didn't install the multibloc at all. I got them to "fix" it but the water system still wasn't satisfactory. After a year I took it all apart and put it all back together with Hep2O. I've been doing my own servicing. G3 doesn't seem to exist in Ireland. Annually I've. 1. Cleaned the strainer in the multibloc. 2. Tested the over pressure valve. 3. Tested the over temp valve. 4. Got a bicycle pump and topped the accumulator back up to 3 bar. Have I missed anything? Anyhou I've bought a cheap Chinese stainless steel unit from eBay. Will see how it fairs when it turns up.
-
@allthatpebbledash, I hope I wasn't poking too much fun with my above post. Sorry if I was. Practically what you are proposing is possible but very uneconomical. It's been alluded in the above posts that with lots of DIY that it could be cheaper. I made the mistake in our old build of not valuing my time enough. I embarked on circuitous routes because of it and it pretty much burnt me out. If you really want to avoid a knock and rebuild then I would step back from the bleeding edge of performance a little. Dig out the ground floor and replace with 300mm EPS. Pour a slab with UFH or float an OSB floor on top. Suck out the mineral wool in the walls, replace with EPS beads. Parge internal walls and apply good airtighess to all joists and wall penetrations. Apply a battened internal service cavity with mineral wool insulation. Plasterboard and skim Install good quality 3g PVC windows and doors. Apply an airtight membrane to the ceiling of the existing roof. Pump 3-400mm of cellulose in there. Install dMEV or ideally dMVHR if possible. You'll get to about 30kWh/m²/annum like this I reckon and it can be done piecemeal. Otherwise knock and rebuild.