That's alot of polystyrene
MBC arrived on site, laid Type 1 and soil pipes pretty quickly and 50mm sand blinding and then set to constructing the EPS raft that is now our slab. Its been said many times on this site, but I will say it again. These guys work hard. They arrived before 7am each day and left at 6pm or later each night. They hardly stopped. And after a week it was assembled. Ready for concrete.