Hello Build Hub!
First Blog entry in our new home.
So things have stalled quite a bit over the last few months. Block layers have left site as they don't want to do the peaks without roof supports.
Trusses have been measured up wrong which has caused some amount of delays. Also having issues sourcing scaffolding but finally have that issue resolved. Just need to get the scaffolding to site.
There have also been some issues with our window cills. Got measured up for windows and window rep informed me that the cills weren't level one side of the cill being closer to the DPC and the other being further into the cavity. This would lead to some potential issues for water ingress and air tightness so needs to be rectified before anything else gets done.
There is also an issue with the height of the inner blockwork at the cills. The inner blocks are currently sitting around 5-10mm higher than the cill level so these need to be cut down a bit.
Hopefully there is nothing too major required to sort this out.
I also have some threads up about a potential problem with our hotpress (its only 850mm wide) and also possible solution to our 3m sunroom opening (Pivot door)
This is how the house currently looks. There has also been a rather large wall built to retain my parents garden and line our driveway. This gives my parents a much bigger garden as this was previously a rather large bank. Oh and my father built a temporary staircase, just means we wont have to be up and down ladders. Also should save the proper stairs, as we wont need them in as soon.
The House
Front Door View
Kitchen
Dining Room/Part of Sunroom
Dining Room View
Temp Stairs
Driveway wall & Garage
- 1
6 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now