Jump to content
  • entries
    9
  • comments
    23
  • views
    2523

Scottish Power - Under-grounding of electricity wires


Lucy Murray

2236 views

05.08.17 - we have FINALLY received our quote for the under-grounding of the electricity wires! 8 weeks and we'll have a date for when the work will commence! Horrah!!!!

7 Comments


Recommended Comments

£3299.20 - Low Voltage Underground Main Works

£1500 - Substation Land & Fees

+VAT

Total - £5759.04

 

Doesn't include any of the site excavations.

Link to comment

No, sounds pretty reasonable.  They charged us around £3,500 to move a pole, run a new underground cable around our site, and across the road to supply a neighbour's house, with us doing all the excavation and laying the ducting for them.

Link to comment

For comparison, current job has 3 new connections from the pavement, with 2 cables surface mounted on the front elevation and another brought into the basement flat underground. 

Nearly £1900 with me doing all private excavation, backfill, drilling and transits, and them just pulling the cables in and mounting the new supply heads. They dug up about a M2 of pavement and Tarmac'd it back in. Half a day's work. 

Link to comment

Another comparison this time with Northern Networks :  The mains cable runs from the pole mounted transformer (30 metres away) underground and parallel to our Northern boundary less than a metre from it. So to tee off from the main and dig 80cm (not a mistype) to our boundary wall where I've dug to from our side, and I've put a pipe in under the wall (so it doesn't fall down - its a drystone wall) then run their cable a total of 3 metres from the main in the trench I've dug to our meter cabinet (which is separate from our house and set into a retaining wall -( I run 2 sub mains from it, one to the house and one across to the garage/workshop) is £1350.  This is all in soil, no tarmac or paths. 8 weeks is good - I've been waiting 6 months now for them to start. 

Edited by curlewhouse
Link to comment

Western Power - dig down 450mm to expose your main, connect to the ducting as installed by me (no more than 300mm away) pull cable and terminate less than 2m away...

 

Road dig is an unmade road and I had to redo what they left as it sank ... 

 

£1650 please .... 

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...