Do you really need 32mm the whole way into the house? We've a ridiculous length of 32mm from the road tapping down to the site, but I added another toby at the side of the house (so no need to drive up the lane) and came out of it at 25mm for the short run into the utility.

Link to comment
Share on other sites

Interesting thread this. I am a ways away from doing this  but I was planning on placing my duct up through my slab with the MDPE pre installed in it and leave however long as required externally. You'd need to buy it at some point anyways might as well stick it through there when its easier. 