Brickie Posted October 15, 2021 Posted October 15, 2021 On 14/10/2021 at 21:47, WWilts said: Pls say how these can be made/used? Expand If you have access to the cavity,you can lay timber on the DPC tray & pull it out at the end of the shift or in the morning. Can be used also to push dropped mortar to the coring holes (the bricks left out for cleaning.) 1
tonyshouse Posted October 15, 2021 Posted October 15, 2021 I prefer eps beads to go right down to the bottom of the cavity to keep it all warmer and reduce thermal bridging 1
Scoobyrex Posted October 20, 2021 Posted October 20, 2021 I am also going full fill cavity with EPS beads. Building inspector mandated lapped dpc at least 1 course down from the inner to outer leaf to enable run off to the outer skin. Pretty much the same as the photo above.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now