Hi All - I need to tackle the patio behind the extension in the next few weeks and am looking for some advice on how something is usually done. The origin site shows you just laying a paver directly onto the cill which I cannot believe it an okay way to do this.   There is supposed to be a weathered threshold between the internal and external floor with about 10mm difference. I am going to come down a bit more than that, say, 15mm to make sure the riddculously oversized doors don't have any clearance issues. What is the right method to bring the slabs right up to the door frame over the cill here please?  Not sure if heat related expansion and contraction needs to be considered for the aluminum cill as well.

 

Planning to use large format porcelain pavers.

 

Any advice welcome. 

 

Thanks, Paul

 

 

 

signal-2026-06-07-180709.jpeg

signal-2026-06-07-180709_002.jpeg

Posted

You can’t bring them to the frame. You’d normally put a slot ACO drain in and then lay up to that, so a linear slot drain deals with rainwater runoff from the doors.

 

You’d need to add an ACO (if you aren't on very permeable ground) and that sits at the end of the sill. Then pavers get laid to that. 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...