PSC88 Posted Thursday at 22:34 Posted Thursday at 22:34 (edited) Hi I am about engage a private building control company for my building control full plans sign off. i just want to make sure I have all the Documents they may request. -block plan -full scaled floor drawings, include cavity/insulation/ventilation info and steel and lintel info also windows. - detailed foundation and drainage drawings include foundation depths, block and beam info. -first floor joist drawings (provided by timber company L) -roof plan and timber joist drawings (provided by timber company) include weight bearing calculations etc - desktop ground survey report - SAP calculation report is there anything I’m missing here? im demolishing a bungalow (only built in 1992) and replacing with a house in largely the same foot print but extending on both sides. will I need anything else to get the building control sign off? Edited Thursday at 22:35 by PSC88
ETC Posted Thursday at 22:38 Posted Thursday at 22:38 Floor plans, elevations and sections. Relevant construction details. Relevant materials specifications. Location map.
Mr Punter Posted Friday at 14:39 Posted Friday at 14:39 You often will just need basic information for an Initial Notice, then they will do a plan check and come back with any queries. Main points are foundations, structure, fire safety and drainage.
kandgmitchell Posted 3 hours ago Posted 3 hours ago That's a pretty good start. The BC company will come back to you with any queries they have. Bit like an MOT - you hope you've got a well prepared car and then they find something you hadn't thought of! (Like the non-working hazard light switch - just saying..) Wait to see if they need any more info.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now