PSC88 Posted Thursday at 22:34 Posted Thursday at 22:34 (edited) Hi I am about engage a private building control company for my building control full plans sign off. i just want to make sure I have all the Documents they may request. -block plan -full scaled floor drawings, include cavity/insulation/ventilation info and steel and lintel info also windows. - detailed foundation and drainage drawings include foundation depths, block and beam info. -first floor joist drawings (provided by timber company L) -roof plan and timber joist drawings (provided by timber company) include weight bearing calculations etc - desktop ground survey report - SAP calculation report is there anything I’m missing here? im demolishing a bungalow (only built in 1992) and replacing with a house in largely the same foot print but extending on both sides. will I need anything else to get the building control sign off? Edited Thursday at 22:35 by PSC88
ETC Posted Thursday at 22:38 Posted Thursday at 22:38 Floor plans, elevations and sections. Relevant construction details. Relevant materials specifications. Location map.
Mr Punter Posted yesterday at 14:39 Posted yesterday at 14:39 You often will just need basic information for an Initial Notice, then they will do a plan check and come back with any queries. Main points are foundations, structure, fire safety and drainage.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now