Jump to content

Recommended Posts

Posted (edited)

Hi

 

I am about engage a private building control company for my building control full plans sign off.

i just want to make sure I have all the

Documents they may request.


-block plan

-full scaled floor drawings, include cavity/insulation/ventilation info and steel and lintel info also windows.

- detailed foundation and drainage drawings include foundation depths, block and beam info.

-first floor joist drawings (provided by timber company L)

-roof plan and timber joist drawings (provided by timber company) include weight bearing calculations etc

- desktop ground survey report 

- SAP calculation report 

 

is there anything I’m missing here?

 

im demolishing a bungalow (only built in 1992) and replacing with a house in largely the same foot print but extending on both sides.


will I need anything else to get the building control sign off?

 

 

 

 

Edited by PSC88
Posted

You often will just need basic information for an Initial Notice, then they will do a plan check and come back with any queries.  Main points are foundations, structure, fire safety and drainage.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...