Roger440 Posted January 29 Posted January 29 Thanks for the explanation. I see 2 issues preventing me here. One, i wouldnt have the first clue about how to manage or deal with the electronic/IT side of all that.. But probably more importantly, if it subsequently showed a problem, that would mean major rework to deal with it. Thats not something i can do. If i do something it has to be right first time. Paying for WUFI is yet more money not spent on actual upgrades. Its not about justfying it, you still have to have it. If it just ended at that report it wouldnt be so bad. But it doesnt. As i suspected, and you essentially confirm using a ubakus model isnt without risk. Which leaves doing nothing as the only "risk free" option. Which, im not keen on as the extension is really quite poor thermally, not helped by fronting into the prevailing wind. The old stone part of the house is far better in that regard. As regard joist ends, that something ive yet to establish what has been done. If its through to the cavity, that probably the end of cavity fill ideas.
Mike Posted January 29 Posted January 29 (edited) 12 hours ago, Roger440 said: i wouldnt have the first clue about how to manage or deal with the electronic/IT side of all that.. But probably more importantly, if it subsequently showed a problem, that would mean major rework to deal with it. Yes, if you're not into electronics and don't know someone who is, then monitoring is out - but if it did show a problem then it would be better to resolve it than to wait for structural damage to set in. However I'm not suggesting using it as a way of pushing the boundaries, only for curiosity or reassurance. I'm doing it for both reasons - WUFI suggests that my ceiling will be OK but, as it's a highly unusual situation and I still have a few reservations with WUFI, I want to validate it. 12 hours ago, Roger440 said: Which leaves doing nothing as the only "risk free" option. Which, im not keen on as the extension is really quite poor thermally Then option 1 on my list is probably going to suit you best, if you still want to consider IWI. That is, go to the technical department of Pro Clima or the like and ask if they'll do an evaluation for you. 12 hours ago, Roger440 said: not helped by fronting into the prevailing wind If you add your proposed rain screen (and it's not airtight), the chances are it will add to the drying capacity of the wall and be in your favour. Although if you can add a rain screen, maybe you can add external wall insulation, which is going to be preferable. 12 hours ago, Roger440 said: As regard joist ends, that something ive yet to establish what has been done. If its through to the cavity, that probably the end of cavity fill ideas There are many properties with cavity fill and joists embedded in the wall without problems so, if you forget the IWI and just fill the cavity, then you should be fine. However make sure that the rooms are adequately ventilated and you make the wall airtight, particularly at the joist-wall junction. At ground floor level, add plenty of ventilation to the sub-floor void (if that isn't already the case) and insulate the floor well - there are other threads on here about both. Edited January 29 by Mike
Roger440 Posted January 30 Posted January 30 21 hours ago, Mike said: Yes, if you're not into electronics and don't know someone who is, then monitoring is out - but if it did show a problem then it would be better to resolve it than to wait for structural damage to set in. However I'm not suggesting using it as a way of pushing the boundaries, only for curiosity or reassurance. I'm doing it for both reasons - WUFI suggests that my ceiling will be OK but, as it's a highly unusual situation and I still have a few reservations with WUFI, I want to validate it. Then option 1 on my list is probably going to suit you best, if you still want to consider IWI. That is, go to the technical department of Pro Clima or the like and ask if they'll do an evaluation for you. If you add your proposed rain screen (and it's not airtight), the chances are it will add to the drying capacity of the wall and be in your favour. Although if you can add a rain screen, maybe you can add external wall insulation, which is going to be preferable. There are many properties with cavity fill and joists embedded in the wall without problems so, if you forget the IWI and just fill the cavity, then you should be fine. However make sure that the rooms are adequately ventilated and you make the wall airtight, particularly at the joist-wall junction. At ground floor level, add plenty of ventilation to the sub-floor void (if that isn't already the case) and insulate the floor well - there are other threads on here about both. Thanks for all the info. As always, hard to know what to do. The cavity AND IWI gives a wall that meets current standard, which i hadnt thought was realistically achievable. Im more keen on heavily insulating the extension and do rather less in the old part which is 2 ft thick stone walls, so lots of unknowns and variables. Good news is, floor is concrete, albeit uninsulated (as far as i know, laid in 19080.) And yes the rainscreen will be ventilated. All pretty conventional.
Julestools Posted 5 hours ago Author Posted 5 hours ago Hi, I'm back at Long last (that was aa busy couple of months!) with a update to my IWI conundrum.. We talked more to builders and suppliers of IWI, considered other materials; for a moment we even got tempted to use PIR, continued going round in circles.. Until one company we spoke to supplying wood fibre did a 'quick WUFI analysis' for us and came up with these recommended maximum thicknesses: Cavity wall as is (cavity filled), 60mm. Cavity with blown insulation removed, 80mm. We've decided to play it safe and go for 60mm wood fibre. The great thing is I can simply mechanically fix the boards to the walls, mesh and plaster, with no timber battens/studs or plasterboard. This should get the walls u value to 0.3 or so, and we're happy with that. Many thanks to @Mike and @Gus Potter amongst others for taking the time to help. The next decision is what to put on the wood fibre? Specialist lime-based plasters such as Baumit rk70 are recommended but I've heard an nhl2/sand mix will also be fine to use and stick well to the boards (along with mesh embedded in the first coat), which is a much more affordable option. Any thoughts would be much appreciated. 😊
Redbeard Posted 5 hours ago Posted 5 hours ago I know someone who tried to use NHL for the same 'economy' reasons. I think the main problem was using it as the 'adhesive coat' behind the boards. As I recall it simply did not stick at all - not even the 'light tack' afforded by RK70. I don't think he ever tried it on the boards, since he had to buy RK70 for the 'adhesive' coat anyway. Particularly if you are doing it yourself and have not done a lot of plastering I'd recommend RK70. It is so 'forgiving'. Slow, in colder weather, but relatively easy for non-plasterers to pick up.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now