junglejim Posted 5 hours ago Posted 5 hours ago Argh I’m overthinking this so could do with some advice. Here’s a photo of my internal stud wall with dpm strips underneath. I was going to lift up the thicker black dpm and lay my floor dpm with double sided tape between the 2 but thinking now that it’s probably better to lay the floor dpm over both? I’m also unsure whether taping is needed or the overlap is sufficient? Paused mid job to think over a brew so any advice greatly appreciated. 👍☕️ @nod@Nickfromwales @saveasteading
Mr Punter Posted 5 hours ago Posted 5 hours ago Is the image the right way up? Does the concrete have a DPM under? If so I would just lay your new DPM and lap up the wall. If not you may need double sided quality DPC taping.
junglejim Posted 5 hours ago Author Posted 5 hours ago 2 minutes ago, Mr Punter said: Is the image the right way up? Does the concrete have a DPM under? If so I would just lay your new DPM and lap up the wall. If not you may need double sided quality DPC taping. Thanks for the reply. This is an internal stud wall on timber frame build. Raft slab. No dpm under the slab. Will lap up external walls but no bed on internal stud as within the envelope but had wondered about taping to the dpm strip under the stud. Have read that overlap alone is sufficient though hence confusion. ta
saveasteading Posted 4 hours ago Posted 4 hours ago Overlap is probably enough, but taping will guarantee it and keep it in place while insulating/screeding.
junglejim Posted 4 hours ago Author Posted 4 hours ago 4 minutes ago, saveasteading said: Overlap is probably enough, but taping will guarantee it and keep it in place while insulating/screeding. Thanks… that was my gut feeling. Do you think good above both?
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now