Hey all

 

before my completed build is signed off as complete can I apply for permitted development?

basically I wish to add some velux windows ( not over looking anyone ) .

if I apply for an amendment it will be the usual nightmare ( took 2 years to sort the gates , I just had some made and installed about 1 yr before they even agreed ) .

if I just put them in then the lovely neighbors will contact enforcement ( which may not be an issue ! )

a permitted development in writing for lawfulness I have done before ( to avoid any future issues ) .

so can I apply for that before a build is complete ??

just trying to hedge my bets !!!

 

cheers 

Edited by pocster
Link to comment
Share on other sites

AFAIK, something like this falls under the scope of your planing permission. Read  the NoD.  It will normally include a clause like:

 

The development shall not be carried out otherwise than in complete accordance with the approved plans Drawing Nos: ... received on the DD Mon YYYY, unless
a non-material amendment is approved by the Local Planning Authority under the Town and Country Planning (Development Management Procedure) Order 2010.


Reason : To clarify the permission and for the avoidance of doubt

 

Unless the Velux literally can't be seen by your neighbours, I suspect that the LA will treat this as a Minor-Material Amendment rather than a NMA.

Link to comment
Share on other sites

I can't call this.

 

I think I might make sure they are easy to installed make sure the roof structure is exactly ready etc, then do it afterwards if I knew I would have PD rights.

 

The easy way to eat an elephant is one piece at a time.

 

But your circs may suggest otherwise.

Link to comment
Share on other sites

PD doesn’t kick in until after sign off. What you can do is make your life easy, frame out all the openings and trial fit the Velux and then put temporary battens etc over the hole. Plug and fill from the inside for your air test and then as soon as you get sign off you fit them under PD. 

 

This is also assumes you haven’t had PD removed as a planning condition ..! 

Link to comment
Share on other sites

1 hour ago, PeterW said:

PD doesn’t kick in until after sign off. What you can do is make your life easy, frame out all the openings and trial fit the Velux and then put temporary battens etc over the hole. Plug and fill from the inside for your air test and then as soon as you get sign off you fit them under PD. 

 

This is also assumes you haven’t had PD removed as a planning condition ..! 

Pd removed ! . Erk it’s possible as this was a contentious application. I’d better dig through all the paperwork....

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...