LSB Posted Saturday at 13:19 Posted Saturday at 13:19 Alan, can I come and see how your cladding is fitted for when we eventually get to that stage. J & D
G and J Posted Saturday at 16:01 Posted Saturday at 16:01 2 hours ago, LSB said: Alan, can I come and see how your cladding is fitted for when we eventually get to that stage. J & D That’s probably a better idea than going to see Alan’s piles. 😉
Alan Ambrose Posted Saturday at 16:58 Author Posted Saturday at 16:58 @LSB Of course, external battens are up, mouse guard is 1/2 on, cladding has been ordered - should be here in 2-3 weeks:
JohnMo Posted Sunday at 08:23 Posted Sunday at 08:23 @Alan Ambrose What are blue squares on the roof and walls
Nickfromwales Posted Sunday at 13:12 Posted Sunday at 13:12 4 hours ago, JohnMo said: @Alan Ambrose What are blue squares on the roof and walls Damage patches (plasters for houses)? 1
G and J Posted Sunday at 17:01 Posted Sunday at 17:01 3 hours ago, Nickfromwales said: Damage patches (plasters for houses)? Was it machine gunned in a drive by shooting by an irate neighbour? lol
Nickfromwales Posted Sunday at 21:55 Posted Sunday at 21:55 4 hours ago, G and J said: Was it machine gunned in a drive by shooting by an irate neighbour? lol Prob more jealous than irate
Alan Ambrose Posted Monday at 17:42 Author Posted Monday at 17:42 Blue patches are the ‘handiwork’ of the dodgy wood fibre blowers-in. This was their solution to me asking, 1/2 way through the job, whether they had thought about the gable and eaves overhangs. They obviously hadn’t looked at the drawings I sent them or even looked at the building before they started.
zzPaulzz Posted Monday at 20:01 Posted Monday at 20:01 I have blue Tescon patches on the inside of my SmartPly Airtight panels and roof membrane where holes were made to pump the cellulose
Nickfromwales Posted 4 hours ago Posted 4 hours ago On 20/07/2026 at 18:42, Alan Ambrose said: Blue patches are the ‘handiwork’ of the dodgy wood fibre blowers-in. This was their solution to me asking, 1/2 way through the job, whether they had thought about the gable and eaves overhangs. They obviously hadn’t looked at the drawings I sent them or even looked at the building before they started. They’re not exactly ‘colour-sympathetic’, but why is this ‘dodgy’? Is there more to this?
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now