Jump to content

Recommended Posts

Posted

Is there a decent way to reduce a window opening in a Nudura build (Concrete is in already), without risking integrity and air-tightness?

 

One of our window openings is a little bit too big to be able to be configured how we want. Ideally, we need to pull the sides in by about 50mm each side and the bottom up by 150mm.

 

In doing so, we can keep with the Triple Glazed, Top-Hung Outward opening window that we prefer as opposed to a Tilt & Turn window, which we're not very keen on.

Posted
43 minutes ago, Redbeard said:

How about rigid EWI which you can fix to the concrete and then render over?

 

This is just in the window openings. The existing EPS can stay (or not). It won't need to be rendered as it'll be part of the window detailing.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...