flanagaj Posted March 4, 2024 Posted March 4, 2024 I received the estimators online quote back today, and I was quite surprised by the labour cost for the slab. Just going through the numbers to see where I could potentially save some money. 12k in labour sounds rather expensive. Ground floor UoM Labour Quantity Labour Total £ UoM Material Quantity Material Total £ Lay & compact MOT type 1 hardcore, delivered loose. Tn 43.148 2,021.23 Tn 44.000 1,409.86 Tool hire, plate compactor for the above task. > > > Dy 1.000 36.63 Sand blinding, delivered loose. Tn 14.383 524.03 Tn 15.000 481.13 Foil faced rigid PIR insulation board 2400x1200x100mm. M² 159.807 1,176.33 Ea 59.000 3,122.47 Polythene membrane, blue standard duty 300mu 100m2 rolls. M² 159.807 665.42 Rl 2.000 128.74 Polythene vapour control layer, blue standard duty. M² 159.807 998.13 Rl 2.000 128.74 Floor slab, cold bridge 200mm upstand M¹ 143.100 554.40 Ea 11.000 222.18 Concrete floor slab 100mm thick. M² 159.807 2,994.40 M³ 16.000 2,377.58 Tool hire, petrol power float for the above task. > > > Dy 1.000 45.79 Floor Screed, premixed delivered 1:3 mix. M² 154.038 3,347.12 Tn 24.000 3,228.49 12,281.06 11,181.61 This is the first time I've used estimators online, and I think I could have maybe been more specific. The floor plan had a kitchen with island shown, but they haven't put a kitchen in the quote or the utility room.
NandM Posted March 19, 2024 Posted March 19, 2024 I found their labour and material pricing very hit and miss. But it does give a great starting point and you also have a nice list of the activities to help with actual quotes.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now