Hi all

 

I've got buried 22mm mdpe running to a garden room.  To serve a shower, basin and loo.   I'm planning to use 15mm PEX to the shower and loo and 22mm for the shower (and immersion). 

 

Is there a good way to transition from the MDPE to 22mm PEX or copper?  Ideally pushfit or solder.

 

Thanks

Justin

 

 

 

Link to comment
Share on other sites

The MDPE is already in place and 20mm. No choice there as it's been in the ground for a decade (I made a mistake typing 22mm in the first post)

 

So convert down to 15mm for the transition.  Then into a manifold to feed the immersion, shower and low demand separately?  

 