Skip to content
View in the app

A better way to browse. Learn more.

BuildHub.org.uk

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Transition from MDPE

Featured Replies

Hi all

 

I've got buried 22mm mdpe running to a garden room.  To serve a shower, basin and loo.   I'm planning to use 15mm PEX to the shower and loo and 22mm for the shower (and immersion). 

 

Is there a good way to transition from the MDPE to 22mm PEX or copper?  Ideally pushfit or solder.

 

Thanks

Justin

 

 

 

Yeah, brass 25mm to 15mm stock is easiest and cheapest way. Remember reinforcing insert on the MDPE for the compression fitting.

  • Author

So do all in 15mm incl the shower?  

 

Or is the suggestion to go from MDPE 20 to PEX 15 then back up to 22mm?  Wouldn't that throttle the flow to the shower?

 

You don't need 22mm for a shower. You can go 25mm MDPE to 22mm copper, then split down to individual 15mm pipes via a small manifold if you wish.

  • Author

The MDPE is already in place and 20mm. No choice there as it's been in the ground for a decade (I made a mistake typing 22mm in the first post)

 

So convert down to 15mm for the transition.  Then into a manifold to feed the immersion, shower and low demand separately?  

 

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.