Jump to content

First fix


nod

Recommended Posts

Cause you only take photos of when you finish sweeping up!

 

no seriously good result, provide bins, skip, designated dumping areas and keep the site clear, my mate is pulling his hair out on a job cause of that much rubbish on the floor making it difficult to use telelift.

he didn’t make the mess, but ends up doing it

Link to comment
Share on other sites

1 hour ago, MikeSharp01 said:

Whow / how do you keep the site so 'clear' of everything?

 

1 hour ago, MikeSharp01 said:

Whow / how do you keep the site so 'clear' of everything?

Probably because we are doing everything ourselves 

I just allow half an hour to get all the tools back in the van and have sweep up 

Link to comment
Share on other sites

1 hour ago, TonyT said:

Cause you only take photos of when you finish sweeping up!

 

no seriously good result, provide bins, skip, designated dumping areas and keep the site clear, my mate is pulling his hair out on a job cause of that much rubbish on the floor making it difficult to use telelift.

he didn’t make the mess, but ends up doing it

Thanks Tony

Im doing a site for Wilmott Dixon They send an email out if there are screws left on the floor after first fixing 

I’m not that bad but I hate mess

I go each night after work for three hours and want to be able to start ten minutes after getting there 

 

my days mess come home with me as I’ve no skip on site 

and manage our previous build with ever having one 

image.jpg

Link to comment
Share on other sites

54 minutes ago, nod said:

 

Im doing a site for Wilmott Dixon They send an email out if there are screws left on the floor after first fixing 

 

Been there done that. Just about managed to keep my t shirt, periodically lost my sanity, lost my faith  in the construction industry and the training capability of the CITB ….oh and tens of thousands of pounds. More invented jobs than the ecology scam. Biggest pile of ………. Oops did I ever mention that just reading their name winds me up ?

Edited by Canski
Link to comment
Share on other sites

8 hours ago, Canski said:

Been there done that. Just about managed to keep my t shirt, periodically lost my sanity, lost my faith  in the construction industry and the training capability of the CITB ….oh and tens of thousands of pounds. More invented jobs than the ecology scam. Biggest pile of ………. Oops did I ever mention that just reading their name winds me up ?

It’s crazy 

Safety tags on our 300 mil high hop ups 

No sweeping allowed Vacuuming out after plastering 

No extension leads 27 staff in the site office Most wanting around with iPads looking for breaches 

Site meeting every morning 8-9 

The list goes on

Link to comment
Share on other sites

7 minutes ago, nod said:

It’s crazy 

Safety tags on our 300 mil high hop ups 

No sweeping allowed Vacuuming out after plastering 

No extension leads 27 staff in the site office Most wanting around with iPads looking for breaches 

Site meeting every morning 8-9 

The list goes on

‘Can you add the steel fixers invoice amount to yours so that you can pay him then we will pay you because he doesn’t pass our compliance checks. ‘ 15 people planning the Xmas party for 3 days, monthly re painting of the site hoarding etc. I did 2 sites for them and saw 3 subbies go bust. Things went downhill for me after I sent them a clean up notice after their assistant site manager installed a TV in the canteen leaving the mess all over the floor. This was after they stopped me working because my brick stacks weren’t plumb. Never ever again. 

  • Like 1
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...