MortarThePoint Posted June 18, 2023 Share Posted June 18, 2023 In bathrooms I plan to have walls that are tiled up to a height and then plastered above that height. How should I approach this? Blockwork background. I can think of: 1. Bare blocks for tiling and put a batten or something on the wall and plasterer comes down to that 2. HardWall and MultiFinish plaster & skim whole area and tile in top 3. Sand&Cement plaster whole area and skim down to a line. Tile over bare S&C plaster 4. Tile bare blockwork before plastering 5. Something I haven't thought of 🙂 Link to comment Share on other sites More sharing options...
MortarThePoint Posted June 18, 2023 Author Share Posted June 18, 2023 Tile thickness may be a factor. If putting onto plaster the tiles sit further forward. One room has a mix of blockwork and plasterboard. One is just blockwork. Link to comment Share on other sites More sharing options...
nod Posted June 18, 2023 Share Posted June 18, 2023 Unless they are very heavy tiles Dot and dab with moister boards and skim part way If they are heavy 10 mil plus S&C 1 Link to comment Share on other sites More sharing options...
PeterW Posted June 18, 2023 Share Posted June 18, 2023 What is your waterproofing strategy for the tiled areas ..? Link to comment Share on other sites More sharing options...
MortarThePoint Posted June 18, 2023 Author Share Posted June 18, 2023 (edited) 9 minutes ago, PeterW said: What is your waterproofing strategy for the tiled areas ..? Good question. Not given much thought but intended to use waterproof tile adhesive and waterproof grout. Any recommendations? Edited June 18, 2023 by MortarThePoint Link to comment Share on other sites More sharing options...
MortarThePoint Posted June 18, 2023 Author Share Posted June 18, 2023 (edited) 20 minutes ago, nod said: Unless they are very heavy tiles Dot and dab with moister boards and skim part way If they are heavy 10 mil plus S&C Wife is full of opinions but not decisions so probably makes sense to S&C. Also, not a fan of D&D. Edited June 18, 2023 by MortarThePoint Link to comment Share on other sites More sharing options...
nod Posted June 18, 2023 Share Posted June 18, 2023 Dot and dab is fine and has a warmer feel than sand and cement I dot and dabbed our last build and will do the same with this one Only about 20% of my business is wet plaster 20 years ago it was the other way round Times change its down to personal choice Link to comment Share on other sites More sharing options...
MikeGrahamT21 Posted June 18, 2023 Share Posted June 18, 2023 6 hours ago, MortarThePoint said: Good question. Not given much thought but intended to use waterproof tile adhesive and waterproof grout. Any recommendations? neither grout or tile adhesive is truly waterproof afaik Some people use tanking on top of s&c render which provides a true waterproof layer. a waterproofing strategy should include the failure of grout and adhesive, it’s worst case scenario stuff so if it happens your covered Link to comment Share on other sites More sharing options...
MortarThePoint Posted June 18, 2023 Author Share Posted June 18, 2023 1 hour ago, MikeGrahamT21 said: neither grout or tile adhesive is truly waterproof afaik Some people use tanking on top of s&c render which provides a true waterproof layer. a waterproofing strategy should include the failure of grout and adhesive, it’s worst case scenario stuff so if it happens your covered I was planning to use a tanking kit in the shower but not the rest of the room (e.g. not near bath). Link to comment Share on other sites More sharing options...
MikeGrahamT21 Posted June 19, 2023 Share Posted June 19, 2023 15 hours ago, MortarThePoint said: I was planning to use a tanking kit in the shower but not the rest of the room (e.g. not near bath). Spot on 👍 Link to comment Share on other sites More sharing options...
MortarThePoint Posted September 18, 2023 Author Share Posted September 18, 2023 On 18/06/2023 at 08:41, nod said: If they are heavy 10 mil plus S&C What do you do at reveals when doing sand and cement (S&C) plastering on walls? Do you line with plasterboard as normal and then skim over both the S&C and the plasterboard with MultiFinish? Link to comment Share on other sites More sharing options...
nod Posted September 18, 2023 Share Posted September 18, 2023 Once over we would render the reveals But now most have cavity closers So if there’s enough room we line them with plasterboard Or with most of the tilt and some of the Ally frames We simply finish the edge with a stop bead and tile directly onto the block reveals 1 Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now