Canski Posted April 29, 2023 Share Posted April 29, 2023 I had this from building control. What do I need to comply ? Does the cabling need to be connected to any sort of termination point ready for a charger to be added at a later date ?if so what do I need. ‘The requirement is one charging point for each unit, plus cabling to be provided per associated vehicle space within the boundary of the properties.’ Link to comment Share on other sites More sharing options...
ProDave Posted April 29, 2023 Share Posted April 29, 2023 I read that as you must provide 1 working charge point, PLUS the cabling installed ready to add additional charging points for each vehicle space you have so those can be upgraded later. for the additional ones, I would just say suitable SWA cable with the ends sealed to keep water out, from the parking space to the consumer unit, ready to be terminated when you want them. 1 Link to comment Share on other sites More sharing options...
Canski Posted April 29, 2023 Author Share Posted April 29, 2023 Ok thanks. One of the three parking spaces is counted as the garage so would I have a charger point set up inside the garage ? Then I could provide cabling to the pillars each side of the garage doors for future chargers ? Link to comment Share on other sites More sharing options...
TonyT Posted April 29, 2023 Share Posted April 29, 2023 (edited) Data cable too probably unless the unit works off 4G personally I would fit ducts to proposed positions, pull in cable such as EV ultra, or separate Swa/ data. Edited April 29, 2023 by TonyT 1 Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now