Jimbo37 Posted February 10, 2023 Posted February 10, 2023 (edited) Hi folks. Anyone understand how you install a radon barrier, when you have block and beam ground floor - the builders QS says we need to "fill" up the underside on the floor. Is this correct - I would have thought it can be installed lower down. Approx, the void w/o fill would be 900mm. TIA Edited February 10, 2023 by Jimbo37 tags
ETC Posted February 10, 2023 Posted February 10, 2023 No. Check out the Visqueen detail. The DPM/radon barrier are above the slab with all joints to DPCs overlapped and taped. FYI don't fill up to the underside of block and beam floor. The reinforcement doesn't have enough cover. Example below. Contact Visqueen and they will do you a site specific detail for your build. 1
Jimbo37 Posted February 10, 2023 Author Posted February 10, 2023 Quote The reinforcement doesn't have enough cover Thanks both - @ETC - what does the quote mean, sorry!
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now