You couldn’t say without detailed drawing

It took me two days to get a 10x7 attic trusses roof ready for slating 

and three weeks to get the main house roof to the same stage 

depends how complex it is

Posted
17 minutes ago, Euan21 said:

Say a 77square meter building half trusses 

Still far too many variables, site location, access, what’s around, working hours, time of year etc etc. then you start on complexity of the structure itself.

Posted

77m2 is quite small

The garage I’ve just done was 105m2 

2 men two day 

man’s a day two install them Velux and felt and baton 

 