Jump to content

Recommended Posts

Posted

More of an observation than anything else.......

 

Im amazed at how muuch pipe bedding im going to need. Just to surround our Graff treatment plant needs nearly 10 tonnes.

Add to that 60-70 meters of pipe to bed in. Not helped by the most ridiculous ground conditions which mean digging any thing less than a 2ft wide trench is impossible. 

 

Ho hum. 

Posted

I suppose it's one of those things that largely depends on your ground conditions.

I had ordered hundreds of pounds worth of pea gravel to bed the septic tank in, but the groundworks guy insisted that the native material was absolutely fine- a sort of friable, crumbly rock- and got me to cancel the order. Seeing as he has installed dozens of tanks locally and has a very good reputation I decided to trust him.

 

Where are you sourcing the stone? It's far cheaper to get it direct from a quarry than it is to buy bagged from the BM.

Posted
8 hours ago, Crofter said:

I suppose it's one of those things that largely depends on your ground conditions.

I had ordered hundreds of pounds worth of pea gravel to bed the septic tank in, but the groundworks guy insisted that the native material was absolutely fine- a sort of friable, crumbly rock- and got me to cancel the order. Seeing as he has installed dozens of tanks locally and has a very good reputation I decided to trust him.

 

Where are you sourcing the stone? It's far cheaper to get it direct from a quarry than it is to buy bagged from the BM.

 

Yes direct from the quarry. Fortunately it's only 10 miles down the road. 

Posted
35 minutes ago, Oz07 said:

Use clay then and do away with the bedding on pipework. All of a sudden £300 on bedding doesn't sound too bad!

 

Hmm good point! 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...